German NIMBY's Force A380 Delivery Site Change | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sat, Nov 27, 2004

German NIMBY's Force A380 Delivery Site Change

Airbus temporarily transfers delivery site to Toulouse due to local construction opposition

If you thought NIMBY's were only a problem in the United States, think again. Airbus has decided to move the delivery site for their new A380 super-jumbo airliners from Hamburg, Germany to Toulouse, France because local environmentalists and residents are opposing the construction of an extension to one of the runways. The extension is needed in order to handle the takeoff and landing test requirements of the new airliner.

"Deliveries will be organised from Toulouse for a limited period," Airbus Deutschland said in a statement. The company wants to the extend the Hamburg runway it intends to use by just under 2,000 feet to accommodate final pre-delivery tests.

The plans, however, have had a major wrench thrown into the works by environmentalists and residents. There's even a local church involved in the fray, because it is refusing to sell the land the airport requires to extend the runway. The fierce opposition from these groups could potentially threaten the A380 contract in Hamburg as well as many as 4,000 jobs.

Because of the high stakes and the possibility of losing thousands of jobs, Hamburg's Mayor Ole von Beust has decided to step into the fray and announce that measures were being taken by the local government to pave the way for expropriation of the land. Airbus in turned welcome von Beust's decision to take action, and added that the company was "keeping open the time window for the construction of the delivery centre until 2006."

FMI: www.airbus.com, www.ham.airport.de/index_en.phtml, http://international.hamburg.de/index/1,2709,JGdlbz0zJG9rPTE4MzM4JHVrPSQ_,00.html

Advertisement

More News

Aero-News: Quote of the Day (11.17.25)

“We achieved full mission success today, and I am so proud of the team. It turns out Never Tell Me The Odds had perfect odds—never before in history has a booster this >[...]

ANN's Daily Aero-Term (11.17.25): NonDirectional Beacon

NonDirectional Beacon An L/MF or UHF radio beacon transmitting nondirectional signals whereby the pilot of an aircraft equipped with direction finding equipment can determine his/h>[...]

NTSB Final Report: Fred L Wellman CH 750 Cruzer

About 5ft Above Ground Level, The Airplane Stalled, And The Left Wing Dropped Analysis: The pilot reported that this flight was conducted as part of phase 1 flight testing of the n>[...]

ANN's Daily Aero-Linx (11.17.25)

Aero Linx: Brodhead Pietenpol Association The Brodhead Pietenpol Association is a newly reorganized (in 2017) non-profit educational corporation that grew and developed from an ear>[...]

Airborne-NextGen 11.11.25: Archer Buys Hawthorne, Joby Conforms, Stranded Astros

Also: VerdeGo Contract, Medi-Carrier, Gambit 6 UCAV, Blade Urban Air Mobility Pilot Archer Aviation has inked a deal for control of Hawthorne Municipal Airport (HHR), also known as>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC