NASA Conducts 3rd RS-25 Engine Test Ahead of Artemis | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Holiday

Airborne-Unlimited-02.20.24

Airborne-Unlimited-02.14.24 Airborne-AffordableFlyers-02.15.24

Airborne-Unlimited-02.16.24

Sun, Dec 03, 2023

NASA Conducts 3rd RS-25 Engine Test Ahead of Artemis

Aerojet Rocketdyne Continues Work on Rocket for Lunar Return

NASA finished the 3rd of a series of 12 ground tests of the SLS rocket that will one day power Artemis program missions to the moon - and beyond.

The RS-25 engines are swinging for the fences in a change from the norm around NASA, where uncrewed, spacefaring drones became the norm. Manned missions require a lot of thrust, and the aged, handworked Saturn V was simply too difficult to recreate today without retreading significant design ground. The RS-25 will boast the best tech that they can build today, with all kinds of additive manufacturing and computer optimization allowing for futuristic improvements in weight and output (hopefully quality, too but only time will tell.) As installed, 4 engines will generate a combined 1.6 million pounds of thrust at launch, and 2 million during ascent. Artemis missions I through IV will use "modified holdover space shuttle main engines", scavenged by NASA and Aerojet Rocketdyne in a feat of thriftiness.

The 11-minute hot fire occurred on the Fred Haise Test Stand at NASA’s Stennis Space Center near Bay St. Louis, Mississippi. This one wasn't a garden variety static test, either, being used to test the engine's gimbaling techniques that will one day prove vital to control and stabilize the SLS as it reaches orbit. As part of the test, operators "also pushed the engine beyond any parameters it might experience during flight to provide a margin of operational safety." In practice, the RS-25s will fire for 500 seconds straight, while the test took one straight to 650 seconds of burn. Even better to stress-test it, the RS-25 was fired up to 113% of regular output, exceeding the "111% needed to lift SLS to orbit."

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Linx (02.22.24)

Aero Linx: Dyersburg Army Air Base Veteran's Museum The Museum is owned and operated by The Dyersburg Army Air Base Memorial Association, Inc., a non-profit organization founded in>[...]

ANN's Daily Aero-Term (02.22.24): Spoofing

Spoofing Denotes emissions of GNSS-like signals that may be acquired and tracked in combination with or instead of the intended signals by civil receivers. The onset of spoofing ef>[...]

Airborne 02.23.24: GA Sales UP, IRS v BizAv, Twin Otter Ferry Suit

Also: Air Canada ChatBot, USPA Seeks Action, JetBlue Pilots, G700 Records The General Aviation Manufacturers Association (GAMA) showed that business is doing all right, with all ai>[...]

Airborne 02.16.24: SnF Constellation!, Drone Soccer, VTOL Challenge

Also: Mandatory CVR Upgrades?, Joby Air Taxi, Hartzell in India, Tuskegee NEXT Summer Program A rare appearance by the Lockheed VC-121A “MacArthur Bataan” is scheduled >[...]

Airborne 02.22.24: Set Jet Kaput, Eclipse Chase, Defending GA-Again

Also: Lakewood Airport v SportAv Haters, UTI-Miramar A&P Program, AERO Friedrichshafen, SnF 24 Update Set Jet, a private jet operator hoping to carve out a niche offering by-th>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC