FAA Dedicates Runway Pavement Testing Facility | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.28.24

Airborne-NextGen-10.29.24

Airborne-Unlimited-10.30.24

Airborne-Unlimited-10.24.24

Airborne-Unlimited-10.25.24

Fri, Aug 28, 2015

FAA Dedicates Runway Pavement Testing Facility

Will Enable The Agency To Research Environmentally-Friendly Airport Pavement Materials

The FAA has dedicated its new National Airport Pavement & Materials Research Center at the William J. Hughes Technical Center at Egg Harbor Township, NJ.

The research center is a unique facility that allows FAA engineers to use a custom-designed vehicle simulator to test asphalt and other pavement materials at very high tire pressures and temperatures. Airport pavement temperatures can reach 140 to 150 degrees Fahrenheit as far north as New York City. Tire pressure ranges from 220 to 250 pounds per square inch on new generation aircraft like the Boeing 787 and Airbus 350. The vehicle simulator has an automated heating system that allows engineers to replicate and analyze the damage that heavy commercial jets can cause to the top asphalt layer when runways are hot. The vehicle was designed to simulate the behavior and weight of aircraft tires, and can show how repetitive aircraft operations affect pavement.

FAA engineers will move the Heavy Vehicle Simulator-Airfields (HVS-A) by remote control between four outdoor pavement test strips and two strips inside a new building, to allow for testing in a controlled environment. FAA engineers recently used the HVS-A to test the performance of airfield paint markings. The HVS-A is 130 feet long, 16 feet wide, 14 feet tall and weighs 240,000 pounds.

The new center will enable the FAA to research environmentally-friendly airport pavement materials such as warm-mix and recycled asphalt pavements.  The FAA’s goal is to expand the use of “greener” materials, and pavement materials that can be modified to enhance pavement durability, workability and strength. This will help airport operators save money by lowering the costs of initial construction, maintenance, and repairs, and will provide a longer pavement life.

The FAA has not recommended the use of environmentally-friendly airport pavement materials yet because research on the effects of aircraft tire pressure and heavy gear loads on green airport pavement materials has been limited.

Construction of the test facility began in August 2013 and was completed in May 2015 at a total cost of $3.8 million. The FAA accepted delivery of the $4.2 million HVS-A on November 1, 2013.

FMI: www.faa.gov

Advertisement

More News

Senator Pushes FAA to Accelerate Rocket Launch Licensing

States That Current Process is Damaging National Aerospace Development US Senator Jerry Morgan is pushing the FAA to speed up the process for rocket launch licensing. He argues tha>[...]

Classic Aero-TV: RJ Gritter - Part of Aviation’s Bright New Future

From 2015 (YouTube Edition): Model Aviator Aims For Full-Scale Career While at the 2015 Indoor Electric RC Festival, referred to as eFest, ANN CEO and Editor-In-Chief, Jim Campbell>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

ANN's Daily Aero-Linx (10.27.24)

Aero Linx: Cardinal Flyers Online The Cardinal Flyers Online Web site was created and is maintained by me, Keith Peterson. My wife Debbie and I have owned a 1976 RG since 1985. Wit>[...]

ANN's Daily Aero-Term (10.27.24): Clearance Void If Not Off By (Time)

Clearance Void If Not Off By (Time) Used by ATC to advise an aircraft that the departure release is automatically canceled if takeoff is not made prior to a specified time. The exp>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC