Ka-Chunk: Guardian Anti-Ballistic Cockpit Security Door Installed | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.24.25

AirborneNextGen-
11.18.25

Airborne-Unlimited-11.19.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Wed, Mar 05, 2003

Ka-Chunk: Guardian Anti-Ballistic Cockpit Security Door Installed

Final STC Test Conformation Demonstrated on Airbus A320

US Global Aerospace, Inc. has installed its Guardian™ Anti-Ballistic Cockpit Security Door on an Airbus A320 in Denver (CO), as part of the final phase of the U.S. Federal Aviation Administration’s Supplemental Type Certification process.

The complete installation was accomplished in under 8 hours -- less than one shift -- on an Airbus A320 owned by Ryan Air, and was validated by Future Jet Aerospace Inc., an independent aviation consulting firm (Dallas TX). The Guardian Door combines USGA’s kinetic energy absorbers, lightweight G-Lam™ anti-ballistic material and a proprietary passive vent system to provide access security and ballistic and decompression protection to the flight crew while eliminating the need for costly and time consuming airframe structural enhancements common on alternative cockpit security solutions.

"Other doors on the market can take over 200 labor hours and more than four days to install. Taking an aircraft out of service for such an extended period could potentially cost an aircraft operator millions of dollars in lost revenue.

"Our Guardian Door is not only secure and robust; we believe it also presents the most expedient and cost-effective cockpit fortification solution available," said John Robinson, CEO of USGA. “The light weight of our door (less than 50 pounds, compared to 85 to 120 pounds for others) results in additional fuel savings over the long term. In addition, the Guardian Door design has only 14 parts, which equates to lower potential component failure rates than competitive designs, some of which have in excess of 80 different parts.”

USGA has also made significant progress in developing commercial construction wall panels that integrate the anti-ballistic qualities of USGA’s proprietary G-Lam material with blast mitigation and fire suppression technologies. These lightweight panels are designed to be compatible with current construction techniques and easily retrofitted to existing facilities.

FMI: www.usglobalaero.com

Advertisement

More News

Aero-News: Quote of the Day (11.27.25)

“Achieving PMA for the S-1200 Series magnetos is another step in expanding our commitment to providing the aviation community with the most trusted and durable ‘firewal>[...]

Airborne 11.26.25: Bonanza-Baron Fini, Archer v LA NIMBYs, Gogo Loses$$$

Also: Bell 505 on SAF, NYPA Gets Flak For BizAv 'Abuse', FAA Venezuela Caution, Horizon Update Textron Aviation has confirmed it will be ending production of the Beechcraft Bonanza>[...]

FAA Seeks Info For New Brand-New ATC Platform

State-Of-The-Art Common Automation Platform To Replace Legacy Systems The FAA has issued a Request for Information (RFI) regarding the initiative of the Trump Administration and U.>[...]

USAF Reaper Drone Crashes Off the South Korean Coast

Kunsan Air Base Reported the Accident During Routine Operations The US Air Force has confirmed that it lost an MQ-9 Reaper drone to the South Korean waters on November 24. The airc>[...]

Hartzell Engine Tech Magneto Gains FAA-PMA

PowerUp S-1200 Series Approved, Available for 4- And 6-Cylinder Engines Hartzell Engine Tech announced it received FAA Parts Manufacturer Approval for its PowerUp S-1200 Series air>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC