F-35B Successfully Completes Wet Runway And Crosswind Testing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.28.24

Airborne-NextGen-10.29.24

Airborne-Unlimited-10.30.24

Airborne-Unlimited-10.24.24

Airborne-Unlimited-10.25.24

Wed, Aug 06, 2014

F-35B Successfully Completes Wet Runway And Crosswind Testing

Conducted Over 41 Days And 37 Missions

In an important program milestone enabling U.S. Marines Corps Initial Operational Capability (IOC) certification, the Lockheed Martin F-35B recently completed required wet runway and crosswind testing at Edwards Air Force Base, California.

"This testing is absolutely critical to 2B flight software fleet release and the Marine Corps' IOC," said J.D. McFarlan, Lockheed Martin's vice president for F-35 Test & Verification. "Collectively, the results support clearing the 20 knot crosswind envelope for Conventional Take Off & Landings (CTOL), Short Take Offs (STO) and Short Landings (SL), with ideal handling quality ratings and meaningful improvement over legacy 4th generational fighter aircraft."

The testing, completed in 37 missions during a 41-day period, achieved 114 test points, including 48 of 48 wet runway test points, four of four performance STOs, 12 of 18 unique flight test conditions for STO, 19 of 23 unique flight test conditions for SLs and all directional control and anti-skid wet runway testing. All testing was performed with BF-4, based at Naval Air Station Patuxent River, Maryland.

In other achievements, four aircraft surpassed flight hour milestones, demonstrating program maturity and reliability: F-35C aircraft CF-1 and F-35A aircraft AF-4 achieved 500 flight hours, and F-35C aircraft CF-5 achieved 100 flight hours.

(Image from file)

FMI: www.lockheedmartin.com

Advertisement

More News

Senator Pushes FAA to Accelerate Rocket Launch Licensing

States That Current Process is Damaging National Aerospace Development US Senator Jerry Morgan is pushing the FAA to speed up the process for rocket launch licensing. He argues tha>[...]

Classic Aero-TV: RJ Gritter - Part of Aviation’s Bright New Future

From 2015 (YouTube Edition): Model Aviator Aims For Full-Scale Career While at the 2015 Indoor Electric RC Festival, referred to as eFest, ANN CEO and Editor-In-Chief, Jim Campbell>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

ANN's Daily Aero-Linx (10.27.24)

Aero Linx: Cardinal Flyers Online The Cardinal Flyers Online Web site was created and is maintained by me, Keith Peterson. My wife Debbie and I have owned a 1976 RG since 1985. Wit>[...]

ANN's Daily Aero-Term (10.27.24): Clearance Void If Not Off By (Time)

Clearance Void If Not Off By (Time) Used by ATC to advise an aircraft that the departure release is automatically canceled if takeoff is not made prior to a specified time. The exp>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC