Aero-TV: Slow and Steady -- Updated Eclipse Program Maintains Course | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.03.24

Airborne-NextGen-06.04.24

Airborne-Unlimited-06.05.24 Airborne-AffordableFlyers-06.06.24

Airborne-Unlimited-06.07.24

Thu, Oct 14, 2010

Aero-TV: Slow and Steady -- Updated Eclipse Program Maintains Course

Embattled VLJ Keeps Up With Promising Comeback

With the 2010 rendition of NBAA's annual convention literally days away, a recent trip to KABQ necessitated a run over to Eclipse to see what they might have in store for this year's event in Atlanta, GA.

We covered a number of topics... though Eclipse Honcho Mason Holland refused to divulge any of the announcements planned for Atlanta... but did offer up a status report on all things Eclipse and Total Eclipse.

Recently, ANN reported on the completion of an enhanced windshield application for the dissipation of precipitation static on windshields, and aircraft design changes for operation up to 41,000 feet -- in accordance with promises they made to Eclipse aircraft owners after EAI acquired the assets of the previous company.

The new FAA certified windshield application uses a thin carbon strip that is adhered directly to existing Eclipse twin-engine jet windshields. This maintenance-free strip is bonded across the windshield and to the aircraft structure creating a conductive path, which acts as a diverter to dissipate potential precipitation static under certain flight conditions.

In addition to the improved windshield application, EAI also announces the successful completion of the engineering requirements addressing the existing FAA Airworthiness Directive, restricting flight to 37,000 feet. Eclipse is actively testing these modifications and has completed the final design.

Final certification of the aircraft modifications are expected prior to the end of the year. After installation in the aircraft, these modifications will permit the EA500 to return to a service ceiling of 41,000 feet.

Mason also noted that the Total Eclipse refurbishment programs seems to be holding its own despite the vagaries of a tough economy and our inspection of a recent TE completion showed off some pretty nice work... especially on the interior. So far... so good!

FMI: www.eclipseaerospace.com, www.aero-tv.net, www.youtube.com/aerotvnetwork, http://twitter.com/AeroNews

Advertisement

More News

ANN's Daily Aero-Term (06.10.24): Known Traffic

Known Traffic With respect to ATC clearances, means aircraft whose altitude, position, and intentions are known to ATC.>[...]

ANN's Daily Aero-Linx (06.10.24)

Aero Linx: Aviation Suppliers Association (ASA) Established February 25, 1993, the Aviation Suppliers Association (ASA), based in Washington, D.C., is a not-for-profit association,>[...]

ANN's Daily Aero-Term (06.11.24): Abeam

Abeam An aircraft is “abeam” a fix, point, or object when that fix, point, or object is approximately 90 degrees to the right or left of the aircraft track. Abeam indic>[...]

ANN's Daily Aero-Linx (06.11.24)

Aero Linx: The Air Charter Safety Alliance The group, called the Air Charter Safety Alliance, will raise awareness of illegal charter flights among potential customers, charter bro>[...]

Aero-News: Quote of the Day (06.11.24)

“For months, ALPA has been sounding the alarm on the ongoing efforts by some aircraft manufacturers to remove pilots from the flight deck and replace them with automation. To>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC