AD: The Boeing Company Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.01.25 (Holiday)

Airborne-Unlimited-09.02.25

AirborneNextGen-09.03.25

Airborne-Unlimited-09.04.25

AirborneUnlimited-08.22.25

Tue, Aug 29, 2017

AD: The Boeing Company Airplanes

AD NUMBER: 2017-17-16

PRODUCT: Certain The Boeing Company Model 767 airplanes.

ACTION: Final Rule.

SUMMARY:  This AD was prompted by a report of cracking of the vertical stiffener in the nose wheel well.

This AD requires repetitive inspections of the nose wheel well bulkhead stiffener for any cracking, and corrective actions if necessary.

DATES: This AD is effective October 2, 2017.

COST: The FAA estimates this AD affects 144 airplanes of U.S. registry. The cost of compliance is estimated to be $850 per inspection cycle per aircraft. Repairs, if necessary, is estimated to cost $1,530 per aircraft.

FMI: AD

Advertisement

More News

Classic Aero-TV: Brazilian Hummingbird Alights in U.S.

From 2023 (YouTube edition): The Resurgent Gyroplane Existing at the confluence of the airplane, the helicopter, and the pinwheel, the machine known alternately as the autogiro and>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

ANN's Daily Aero-Linx (09.01.25)

Aero Linx: Brodhead Pietenpol Association The Brodhead Pietenpol Association is a newly reorganized (in 2017) non-profit educational corporation that grew and developed from an ear>[...]

ANN's Daily Aero-Term (09.01.25): Receiver Autonomous Integrity Monitoring

Receiver Autonomous Integrity Monitoring (RAIM) A technique whereby a civil GNSS receiver/processor determines the integrity of the GNSS navigation signals without reference to sen>[...]

NTSB Prelim: Rockwell International 112

...Attempted To Reach The Runway But Landed About 15 Ft Short And Impacted A Berm On July 23, 2025, about 1300 eastern daylight time, N112EF, a Rockwell International 112 airplane,>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC