Fri, Mar 29, 2019
AD NUMBER: 2019-06-07
PRODUCT: Certain Pratt & Whitney Division (PW) PW4164, PW4164-1D, PW4168, PW4168-1D, PW4168A, PW4168A-1D, and PW4170 model turbofan engines.
ACTION: Final Rule.
SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2016-22-05 for the engines listed above.
AD 2016-22-05 required initial and repetitive inspections of the affected fuel nozzles and their replacement with parts eligible for installation.
This AD requires initial and repetitive inspections of the affected fuel nozzles and fuel nozzle supply manifold assemblies, replacement of the affected fuel nozzles with parts eligible for installation, and the installation of new brackets and clamps on the fuel nozzle supply manifold assemblies.
This AD was prompted by several instances of fuel leaks on PW engines with the Talon IIB combustion chamber configuration installed.
DATES: This AD is effective May 2, 2019.
COST: The FAA estimates that this AD affects 72 engines installed on airplanes of U.S. registry. Operators may incur the following costs in order to comply with this AD:
- Inspect fuel nozzles: 2.2 work-hours × $85 per hour = $187 per engine.
- Open and close cowl doors: (on-wing) 1 work-hour × $85 per hour = $85 per engine
- Remove and replace (24) fuel nozzles: 48 work-hours × $85 per hour = $4,080, Parts $423,471. Cost per engine: $427,551
- Remove and re-install necessary hardware according to AMM: 23 work-hours × $85 per hour = $1,955 per engine
- Replace Fuel Nozzle Supply Manifold Assemblies and install new clamps/brackets: 16 work-hours × $85 per hour = $1,360. Parts $77,159. Cost per engine: $78,519
FMI: AD
More News
Area Navigation (RNAV) A method of navigation which permits aircraft operation on any desired flight path within the coverage of ground− or space−based navigation aids >[...]
Aero Linx: The Collings Foundation The Collings Foundation is a non-profit, Educational Foundation (501(c)3), founded in 1979. The purpose of the Foundation is to preserve and exhi>[...]
“We learned a great deal in the process, such as greater coding skills, soldering techniques, and video editing skills...” Source: Cuyahoga County Team Captain John Ana>[...]
Also: Swift Hits 56000', 100 Midnight Order, $1.4B For ATC, USCG/USAF Rescue Op INTEGRAL E, the all-electric version of Aura Aero’s two-seat aircraft, made its maiden flight >[...]
Also: Van Celebrates 85th, Trio Pro Pilot Autopilot, Joby on MSFS24, Sonex Transition The BushCat was manufactured in South Africa by SkyReach beginning in 2014, selling its first >[...]