Vega To Fly ESA Experimental Reentry Vehicle | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.19.25

Airborne-NextGen-05.20.25

AirborneUnlimited-05.21.25

Airborne-AffordableFlyers-05.22.25

AirborneUnlimited-05.23.25

Tue, Dec 20, 2011

Vega To Fly ESA Experimental Reentry Vehicle

Launch Of IXV Planned In 2014 From French Guiana

The launch of ESA's IXV Intermediate eXperimental Vehicle on Europe's new Vega rocket is now in detailed planning, a major step towards the craft's flight in 2014. After launch into a suborbital trajectory from Europe's Spaceport in French Guiana, IXV will return to Earth as if from a low-orbit mission, to test and qualify new critical technologies for future reentry vehicles.

ESA IXV Artist's Rendering

The flight profile calls for the IXV to attain an altitude of around 279 miles, allowing it to reach a velocity of 4.6 miles/second on entering the atmosphere. It will collect a large amount of data during its hypersonic and supersonic flight, while it is being controlled by thrusters and aerodynamic flaps. IXV will then descend by parachute and land in the Pacific Ocean to await recovery and analysis.

ESA and the Arianespace launch provider signed a contract on 14 December to study the launch on Vega, as part of the VERTA - Vega Research and Technology Accompaniment - program.

The rocket's qualification flight planned for liftoff at the end of January will pave the way for the next five VERTA missions that will demonstrate the system's flexibility. At a planned rate of two launches per year, the program will allow the smooth introduction of Vega for commercial exploitation. Following development of critical technologies and completion of the design, the vehicle's manufacturing, assembly, integration and qualification is now under way for a flight window between January and September 2014.

Procurement of the ground network has begun, including the mission control center, ground station telemetry kits, transportable antennas and communication network.

FMI: www.esa.int

Advertisement

More News

Oshkosh Memories: An Aero-News Stringer Perspective

From 2021: The Inside Skinny On What Being An ANN Oshkosh Stringer Is All About By ANN Senior Stringer Extraordinare, Gene Yarbrough The annual gathering at Oshkosh is a right of p>[...]

NTSB Prelim: Piper PA32RT

Video Showed That During The Takeoff, The Nose Baggage Door Was Open On May 10, 2025, about 0935 eastern daylight time, a Piper PA-32RT-300, N30689, was destroyed when it was invol>[...]

ANN FAQ: Follow Us On Instagram!

Get The Latest in Aviation News NOW on Instagram Are you on Instagram yet? It's been around for a few years, quietly picking up traction mostly thanks to everybody's new obsession >[...]

Aero-News: Quote of the Day (05.28.25)

"I think what is key, we have offered a bonus to air traffic controllers who are eligible to retire. We are going to pay them a 20% bonus on their salary to stay longer. Don't reti>[...]

ANN's Daily Aero-Term (05.28.25): Pilot Briefing

Aero Linx: Pilot Briefing The gathering, translation, interpretation, and summarization of weather and aeronautical information into a form usable by the pilot or flight supervisor>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC