Gulfstream G500 Completes Flutter Testing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.08.25

AirborneNextGen-
12.09.25

Airborne-Unlimited-12.10.25

Airborne-AffordableFlyers-12.11.25

AirborneUnlimited-12.05.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Wed, Feb 10, 2016

Gulfstream G500 Completes Flutter Testing

Company Hopes To Certify The Airplane In 2019

Gulfstream has completed flutter testing on the G500, achieving another milestone in the new aircraft’s flight-test program. The first G500 test aircraft, T1, performed the tests over the course of more than 50 flights.

“The G500 has accomplished a great deal since we launched the flight-test program in May 2015,” said Dan Nale, senior vice president, Programs, Engineering and Test, Gulfstream. “With three aircraft in flight, the program has surpassed 430 flight-test hours over more than 105 flights. This latest accomplishment, as well as the outstanding performance and reliability of all three flight-test aircraft, highlights the tremendous progress being made. The flight-test team has started the new year off with great success.”

As T1 performed flutter testing, the second test article, T2, finished climatic chamber testing at the McKinley Climatic Laboratory, Eglin Air Force Base, Florida. The aircraft endured three days of hot testing, with temperatures reaching 131 degrees Fahrenheit/55 degrees Celsius, followed by two days of cold testing, with temperatures as low as -40 degrees F/-40 degrees C.

Since T1 took its first flight on May 18, 2015, the aircraft has surpassed more than 320 flight hours. It has reached a maximum speed of Mach 0.999 and a maximum altitude of 53,000 feet/16,154 meters. T1’s longest flight to date lasted more than five hours. Additional test activities are continuing on track, including envelope expansion, air data system testing, aero performance, brakes and field performance, handling qualities and flight controls.

The second and third G500 flight-test aircraft, T2 and T3, both took their first flights on Nov. 20, 2015. In addition to the climatic chamber testing, T2 is focusing on flight loads validation, along with aircraft performance and systems testing.

T3 is the primary test bed for the all-new Symmetry Flight Deck.  T3 will also be used to evaluate ice-protection system performance, landing gear and nosewheel steering operation, environmental control system performance and the cabin pressure control system, as well as community noise testing. T3’s longest flight to date lasted more than six hours.

In addition to the three aircraft currently flying, the G500 flight-test program will include two more aircraft. T4 has been inducted into the Flight Test facility and is in the final stages of flight preparation. P1 is a fully outfitted production aircraft that will test the interior elements as well as complete integration of the aircraft systems with the passenger experience.

The G500 is part of Gulfstream’s new family of clean-sheet aircraft, the G500 and G600 . Gulfstream has conducted more than 43,000 hours of testing for both aircraft in Gulfstream’s state-of-the-art lab facilities.

The G500 can fly 5,000 nautical miles at Mach 0.85 or 3,800 nm at Mach 0.90. The aircraft is powered by the new Pratt & Whitney Canada PW814GA engine, which delivers excellent fuel efficiency, fewer emissions and less noise.

The G500 is expected to receive type certification from the U.S. Federal Aviation Administration and European Aviation Safety Agency in 2017. It is scheduled to enter service in 2018, with the G600 following in 2019.

(Image provided with Gulfstream news release)

FMI: www.gulfstream.com

Advertisement

More News

Aero-News: Quote of the Day (12.09.25)

“We respectfully call on the City of Mesa to: 1. Withdraw the landing fee proposal immediately 2. Engage with the aviation community before making decisions that impact safet>[...]

ANN's Daily Aero-Term (12.09.25): High Speed Taxiway

High Speed Taxiway A long radius taxiway designed and provided with lighting or marking to define the path of aircraft, traveling at high speed (up to 60 knots), from the runway ce>[...]

ANN's Daily Aero-Linx (12.09.25)

Aero Linx: International Federation of Airworthiness (IFA) IFA uniquely combines together all those with responsibility for policies, principles and practices concerned with the co>[...]

NTSB Final Report: Diamond Aircraft Ind Inc DA20C1 (A1); Robinson Helicopter R44

Controller’s Expectation That VW02 Would Have Departed Sooner Led To An Inadequate Scan And Loss Of Situational Awareness Analysis: A Robinson R-44 helicopter N744AF, VW02 (V>[...]

ANN FAQ: Q&A 101

A Few Questions AND Answers To Help You Get MORE Out of ANN! 1) I forgot my password. How do I find it? 1) Easy... click here and give us your e-mail address--we'll send it to you >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC