Embraer Cuts Back | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Sat, Sep 05, 2020

Embraer Cuts Back

COVID-19 and the Boeing Deal Failure Will Cost 900 Jobs

Embraer has announced a 4.5% adjustment to its global workforce, which corresponds to approximately 900 employees in Brazil. The measure stems from the impacts caused by the COVID-19 pandemic on the global economy and the cancellation of the company's partnership with Boeing. The objective is to ensure Embraer's sustainability and engineering capacity.

The pandemic particularly affected Embraer Commercial Aviation, which experienced a 75% reduction in aircraft deliveries during the first half of 2020 as compared to the same period last year.
 
The situation worsened as a result of the duplication of structures associated with the carve out of the company's commercial aviation business in preparation for the partnership which was terminated at the initiative of Boeing, as well as the expectation that the air transport sector will not recover in the short- or medium-term.
 
Since the beginning of the pandemic, Embraer has adopted a series of measures to preserve jobs, including collective vacations, reduced working hours, furloughs, paid leave, and three voluntary dismissal plans (VDP). The company has also reduced face-to-face work at its industrial plants with the aim of ensuring the health of employees and business continuity. Around 1,600 employees chose to participate in the VDPs in Brazil.

FMI: www.embraer.com

 


Advertisement

More News

ANN's Daily Aero-Linx (06.29.25)

Aero Linx: Transport Canada We are a federal institution, leading the Transport Canada portfolio and working with our partners. Transport Canada is responsible for transportation p>[...]

ANN's Daily Aero-Term (06.29.25): Gross Navigation Error (GNE)

Gross Navigation Error (GNE) A lateral deviation from a cleared track, normally in excess of 25 Nautical Miles (NM). More stringent standards (for example, 10NM in some parts of th>[...]

Classic Aero-TV: Anticipating Futurespace - Blue Origin Visits Airventure 2017

From AirVenture 2017 (YouTube Edition): Flight-Proven Booster On Display At AirVenture… EAA AirVenture Oshkosh is known primarily as a celebration of experimental and amateu>[...]

NTSB Final Report: Cirrus SR22

Aircraft Parachute System (CAPS) Was Deployed About 293 Ft Above Ground Level, Which Was Too Low To Allow For Full Deployment Of The Parachute System Analysis: The day before the a>[...]

Airborne Affordable Flyers 06.26.25: PA18 Upgrades, ‘Delta Force’, Rhinebeck

Also: 48th Annual Air Race Classic, Hot Air Balloon Fire, FAA v Banning 100LL, Complete Remote Pilot The news Piper PA-18 Super Cub owners have been waiting for has finally arrived>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC