AD: Boeing (757) | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Fri, Dec 28, 2012

AD: Boeing (757)

AD NUMBER: 2012-25-11

PRODUCT: Certain Boeing 757-200, -200CB, and -300 series airplanes.
SUBJECT: Airworthiness Directive 2012-25-11
ACTION: Final Rule

SUMMARY:  The FAA is superseding an existing airworthiness directive (AD) for the product listed above. That AD currently requires initial and repetitive inspections of the fuselage skin and bear strap at the forward, upper corner of the L1 entry door cutout for cracking, and repair if necessary. That action also provides an optional terminating action for the repetitive inspections. That AD also requires additional inspections for airplanes having repairs or preventative modifications installed and inspections for certain other airplanes.

This AD requires the previous actions with additional airplane group configurations added to paragraph (n) of this AD. This AD was prompted by a determination that certain airplane group configurations in paragraph (n) of the existing AD were inadvertently removed in the final rule. The FAA is issuing this AD to detect and correct cracking of the fuselage skin and bear strap at the forward upper corner of the L1 entry door cutout, which could result in reduced structural integrity of the L1 entry door, and consequent rapid decompression of the airplane.

DATES: This AD is effective January 10, 2013.

FMI: AD

Advertisement

More News

Airborne 05.10.24: Icon Auction, Drunk MedEvac Pilot, Bell ALFA

Also: SkyReach Parts Support, Piper Service Ctr, Airliner Near-Miss, Airshow London The Judge overseeing Icon's convoluted Chapter 11 process has approved $9 million in Chapter 11 >[...]

ANN's Daily Aero-Term (05.13.24): ILS PRM Approach

ILS PRM Approach An instrument landing system (ILS) approach conducted to parallel runways whose extended centerlines are separated by less than 4,300 feet and at least 3,000 feet >[...]

ANN's Daily Aero-Linx (05.13.24)

Aero Linx: FlyPups FlyPups transports dogs from desperate situations to fosters, no-kill shelters, and fur-ever homes. We deliver trained dogs to veterans for service and companion>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Airborne 05.08.24: Denali Update, Dad-Daughter Gyro, Lake SAIB

Also: NBAA on FAA Reauth, DJI AG Drones, HI Insurance Bill Defeated, SPSA Airtankers The Beechcraft Denali continues moving forward towards certification, having received its FAA T>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC