U.S. Army Awards Apache Targeting And Pilotage System Sustainment Contract | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.12.25

Airborne-NextGen-05.13.25

AirborneUnlimited-05.14.25

Airborne-FlightTraining-05.15.25

AirborneUnlimited-05.16.25

Sun, Feb 23, 2014

U.S. Army Awards Apache Targeting And Pilotage System Sustainment Contract

Lockheed Martin Will Be Paid $92 Million From The Deal

The U.S. Army awarded a $92 million Performance Based Logistics (PBL) contract in December 2013 to Lockheed Martin for sustainment of the AH-64 Apache helicopter Modernized Target Acquisition Designation Sight/Pilot Night Vision Sensor (M-TADS/PNVS) system.

The firm, fixed-price contract is the foundation for a comprehensive sustainment solution that enables M-TADS/PNVS mission readiness, reduces operation and support costs, and drives reliability and maintainability improvements. This is the second of three one-year options that support the initial $111 million PBL contract awarded in 2012. The total four-year contract value is $375 million.  

"The M-TADS/PNVS PBL program provides critical sustainment support to Apache pilots conducting missions around the world every day," said Mike Taylor, program director of M-TADS/PNVS international and support programs at Lockheed Martin Missiles and Fire Control.

M-TADS/PNVS provides Apache helicopter pilots long-range, precision engagement and pilotage capabilities for mission success and flight safety day or night, or in adverse weather conditions. Forward-looking infrared sensors provide enhanced image resolution that enables Apache aircrews to prosecute targets and provide situational awareness in support of ground troops outside detection ranges. Lockheed Martin has delivered more than 1,200 M-TADS/PNVS systems to the U.S. Army and international customers.

The Apache M-TADS/PNVS PBL program provides efficiencies in supply chain management and critical sustainment support worldwide. During its peak operational tempo of more than 200,000 flying hours, the M-TADS/PNVS PBL program averaged a worldwide supply availability rate of 98 percent.

(Apache helicopter image from file)

FMI: www.lockheedmartin.com

Advertisement

More News

ANN's Daily Aero-Term (05.19.25): Fuel Remaining

Fuel Remaining A phrase used by either pilots or controllers when relating to the fuel remaining on board until actual fuel exhaustion. When transmitting such information in respon>[...]

ANN's Daily Aero-Linx (05.19.25)

Aero Linx: Piper Aviation Museum Preserving the history and legacy of the Piper Aircraft Corporation and its founding family. In the past three years, the Piper Aviation Museum has>[...]

Klyde Morris (05.16.25)

Klyde Has No Patience... FMI: www.klydemorris.com>[...]

Airborne 05.19.25: Kolb v Tornados, Philippine Mars, Blackhawk Antler Theft

Also: Tentative AirVenture Airshow Lineup, Supersonic Flight Regs, Private Pilot Oral Exam Guide, Boeing Deal The sport aircraft business can be a tough one... especially when Moth>[...]

Airborne-Flight Training 05.15.25: Ray Scholarship, Alto NG, Fighter Training

Also: FedEx Pilots, Army Restructuring, Alaska ANG, Incentive for ATC Hiring EAA Chapter 534 in Leesburg, Florida announced that the 2025 Ray Aviation Scholarship winner is Abdiel >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC