Ariane Moves Closer To Launch | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.19.25

Airborne-NextGen-05.20.25

AirborneUnlimited-05.21.25

Airborne-AffordableFlyers-05.22.25

AirborneUnlimited-05.23.25

Sun, May 25, 2003

Ariane Moves Closer To Launch

Spacecraft Moved To Final Assembly Building

The Ariane 5 for Flight 161 took one big step closer to liftoff today when it was transferred from the integration building to the final assembly facility at the Spaceport's ELA-3 launch complex.

In a process that began at 10:30 a.m., the Ariane 5 emerged from the integration building atop its mobile launch table - which was pulled by the Spaceport's multipurpose tug.

It covered the 1.3 km. distance to the final assembly building under a bright sun and only partly cloudy skies overhead.

Flight 161's launcher has been in the integration building since April 25, when the vehicle began its assembly process with the erection of the cryogenic core central stage.

In successive steps, the central stage was mated with the two solid boosters, followed by the integration of Ariane 5's vehicle equipment bay and its EPS upper stage.

With Ariane 5 in the final assembly building, the launch campaign now enters the final stage, which includes integration of the dual satellite payload and the payload fairing.

Liftoff of Flight 161 remains on schedule for early June with the Optus and Defence C1 spacecraft for Australia, and BSAT-2c for the Broadcasting Satellite System Corporation (B-SAT) of Japan.

FMI: www.arianespace.com

Advertisement

More News

Oshkosh Memories: An Aero-News Stringer Perspective

From 2021: The Inside Skinny On What Being An ANN Oshkosh Stringer Is All About By ANN Senior Stringer Extraordinare, Gene Yarbrough The annual gathering at Oshkosh is a right of p>[...]

NTSB Prelim: Piper PA32RT

Video Showed That During The Takeoff, The Nose Baggage Door Was Open On May 10, 2025, about 0935 eastern daylight time, a Piper PA-32RT-300, N30689, was destroyed when it was invol>[...]

ANN FAQ: Follow Us On Instagram!

Get The Latest in Aviation News NOW on Instagram Are you on Instagram yet? It's been around for a few years, quietly picking up traction mostly thanks to everybody's new obsession >[...]

Aero-News: Quote of the Day (05.28.25)

"I think what is key, we have offered a bonus to air traffic controllers who are eligible to retire. We are going to pay them a 20% bonus on their salary to stay longer. Don't reti>[...]

ANN's Daily Aero-Term (05.28.25): Pilot Briefing

Aero Linx: Pilot Briefing The gathering, translation, interpretation, and summarization of weather and aeronautical information into a form usable by the pilot or flight supervisor>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC