AD: Fokker Services B.V. Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.01.25 (Holiday)

Airborne-Unlimited-09.02.25

AirborneNextGen-09.03.25

Airborne-Unlimited-09.04.25

AirborneUnlimited-08.22.25

Wed, Dec 19, 2018

AD: Fokker Services B.V. Airplanes

AD NUMBER: 2018-25-14

PRODUCT: All Fokker Services B.V. Model F28 Mark 0070 and 0100 airplanes.

ACTION: Final Rule.

SUMMARY:  This AD was prompted by reports of electrical arcing between the auxiliary power unit (APU) starter motor positive terminal and the APU fuel drain line.

This AD requires the removal of certain clamps and replacement of the flexible APU fuel drain line.

DATES: This AD is effective January 18, 2019.

COST: The FAA estimates that this AD affects 5 airplanes of U.S. registry. Operators may incur the following costs in order to comply with this AD:

  • Labor - 1 work- hour × $85 per hour = $85
  • Parts - $963
  • Cost per aircraft - $1,048
FMI: AD

Advertisement

More News

Classic Aero-TV: Brazilian Hummingbird Alights in U.S.

From 2023 (YouTube edition): The Resurgent Gyroplane Existing at the confluence of the airplane, the helicopter, and the pinwheel, the machine known alternately as the autogiro and>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

ANN's Daily Aero-Linx (09.01.25)

Aero Linx: Brodhead Pietenpol Association The Brodhead Pietenpol Association is a newly reorganized (in 2017) non-profit educational corporation that grew and developed from an ear>[...]

ANN's Daily Aero-Term (09.01.25): Receiver Autonomous Integrity Monitoring

Receiver Autonomous Integrity Monitoring (RAIM) A technique whereby a civil GNSS receiver/processor determines the integrity of the GNSS navigation signals without reference to sen>[...]

NTSB Prelim: Rockwell International 112

...Attempted To Reach The Runway But Landed About 15 Ft Short And Impacted A Berm On July 23, 2025, about 1300 eastern daylight time, N112EF, a Rockwell International 112 airplane,>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC