Docked, Locked, And Ready To Rock: STS-123 Arrives At ISS | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Thu, Mar 13, 2008

Docked, Locked, And Ready To Rock: STS-123 Arrives At ISS

First Spacewalk Scheduled For Thursday Night

NASA states the combined crews of space shuttle Endeavour and the International Space Station have completed their first day as an orbital team, beginning 12 days of joint operations.

About an hour before docking at the ISS -- which occurred at 2349 EDT Wednesday, about 24 minutes later than planned -- STS-123 Commander Dominic Gorie guided the shuttle through a back-flip maneuver, giving the Expedition 16 crew the opportunity to take pictures of the orbiter’s protective heat-resistant tiles.

These photos were sent to engineers on Earth for analysis. So far, NASA is optimistic Endeavour sustained no serious damage during its early morning liftoff Tuesday.

The STS-123 and Expedition 16 crews opened the hatches between Endeavour and the station at 0136 EDT. The crews then spent time preparing for the first of five scheduled STS-123 spacewalks, which Mission Specialist Rick Linnehan and Expedition 16 Flight Engineer Garrett Reisman will begin at 2123 Thursday.

Shortly after Endeavour’s arrival at the station, Reisman traded places with Flight Engineer Léopold Eyharts, a European Space Agency astronaut, to join the Expedition 16 crew. Eyharts will return to Earth aboard Endeavour.

In addition, the STS-123 crew will install the Canadian-built Dextre -- the final element of the station’s Mobile Servicing System -- and the Japanese Logistics Module - Pressurized Section, which is the first of three components of the Japan Aerospace Exploration Agency’s Kibo laboratory.

FMI: www.nasa.gov

Advertisement

More News

NTSB Final Report: Rutan Long-EZ

He Attempted To Restart The Engine Three Times. On The Third Restart Attempt, He Noticed That Flames Were Coming Out From The Right Wing Near The Fuel Cap Analysis: The pilot repor>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

Classic Aero-TV: ICAS Perspectives - Advice for New Air Show Performers

From 2009 (YouTube Edition): Leading Air Show Performers Give Their Best Advice for Newcomers On December 6th through December 9th, the Paris Las Vegas Hotel hosted over 1,500 air >[...]

ANN's Daily Aero-Linx (06.28.25)

Aero Linx: NASA ASRS ASRS captures confidential reports, analyzes the resulting aviation safety data, and disseminates vital information to the aviation community. The ASRS is an i>[...]

Aero-News: Quote of the Day (06.28.25)

“For our inaugural Pylon Racing Seminar in Roswell, we were thrilled to certify 60 pilots across our six closed-course pylon race classes. Not only did this year’s PRS >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC