NASA Successfully Reboots Mars Odyssey Orbiter | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Thu, Mar 12, 2009

NASA Successfully Reboots Mars Odyssey Orbiter

CTRL-ALT-DEL-Red Planet

NASA's Mars Odyssey orbiter properly followed commands sent Wednesday to shut down and restart, a strategy by its engineers to clear any memory flaws accumulated in more than five years since Odyssey's last reboot.

The procedure also restored Odyssey's onboard set of backup systems, called the spacecraft's "B side," allowing its use in the future when necessary.

"For nearly two years, we have not known for certain whether the backup systems would be usable, so this successful reboot has allowed us to ascertain their health and availability for future use," said Odyssey Project Manager Philip Varghese of NASA's Jet Propulsion Laboratory, Pasadena, CA.

Odyssey has been orbiting Mars since 2001 and has never switched from its primary set of components, the "A side," to the backup set, which includes an identical computer processor, navigation sensors, relay radio and other components. In March 2006, the B-side spare of a component for managing the distribution of power became inoperable. Analysis by engineers identified a possibility that rebooting Odyssey might restore that component, which proved to be a side benefit of today's procedure to refresh onboard memory.

The Odyssey team began a series of steps after the reboot to carefully return the spacecraft to full functioning over the next few days. Following that path, the science instruments will be back to studying Mars by next week.

An unexpected rise in temperature of the star camera in Odyssey's navigation system on March 9 had prompted a postponement of the rebooting originally scheduled for the next day, as ANN reported. Engineers identified the cause as a heater circuit that was temporarily stuck "on." The circuit was turned off before Wednesday's reboot.

JPL, a division of the California Institute of Technology, Pasadena, manages Mars Odyssey for the NASA Science Mission Directorate, Washington. Lockheed Martin Space Systems, Denver, is the prime contractor for the project and built the spacecraft.

FMI: www.nasa.gov/mission_pages/odyssey

Advertisement

More News

Airborne 05.10.24: Icon Auction, Drunk MedEvac Pilot, Bell ALFA

Also: SkyReach Parts Support, Piper Service Ctr, Airliner Near-Miss, Airshow London The Judge overseeing Icon's convoluted Chapter 11 process has approved $9 million in Chapter 11 >[...]

ANN's Daily Aero-Term (05.13.24): ILS PRM Approach

ILS PRM Approach An instrument landing system (ILS) approach conducted to parallel runways whose extended centerlines are separated by less than 4,300 feet and at least 3,000 feet >[...]

ANN's Daily Aero-Linx (05.13.24)

Aero Linx: FlyPups FlyPups transports dogs from desperate situations to fosters, no-kill shelters, and fur-ever homes. We deliver trained dogs to veterans for service and companion>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Airborne 05.08.24: Denali Update, Dad-Daughter Gyro, Lake SAIB

Also: NBAA on FAA Reauth, DJI AG Drones, HI Insurance Bill Defeated, SPSA Airtankers The Beechcraft Denali continues moving forward towards certification, having received its FAA T>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC