NASA Schedules Second Rocket Test for Artemis Moon Missions | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-08.11.25

Airborne-NextGen-08.12.25

AirborneUnlimited-08.13.25

Airborne-AffordableFlyers-08.07.25

AirborneUnlimited-08.08.25

Tue, Mar 16, 2021

NASA Schedules Second Rocket Test for Artemis Moon Missions

The Hot Fire Is The Eighth And Final Test Of The Green Run Series

NASA is targeting a two-hour test window that opens at 3 p.m. EDT Thursday, March 18, for the second hot fire test of the core stage for the agency’s Space Launch System (SLS) rocket at NASA’s Stennis Space Center near Bay St. Louis, Mississippi.

On test day, engineers will power up all the core stage systems, load more than 700,000 gallons of cryogenic, or supercold, propellant into the tanks, and fire the rocket’s four RS-25 engines at the same time to simulate the stage’s operation during launch, generating 1.6 million pounds of thrust.

The hot fire is the eighth and final test of the Green Run series to ensure the core stage of the SLS rocket is ready to launch Artemis missions to the Moon, beginning with Artemis I. The core stage includes the liquid hydrogen tank and liquid oxygen tank, four RS-25 engines, as well as the computers, electronics, and avionics that serve as the “brains” of the rocket.

The first in a series of increasingly complex missions, Artemis I will test the SLS rocket and Orion spacecraft as an integrated system ahead of crewed flights to the Moon. Under the Artemis program, NASA is working to land the first woman and the next man on the Moon to pave the way for sustainable exploration at the Moon and future missions to Mars.

FMI: www.nasa.gov/artemisprogram/greenrun

Advertisement

More News

Diamond Delivers Fifth DA62 MPP To 2Excel

Becomes Largest Global Operator Of The Type Diamond Aircraft announced the delivery of the fifth DA62 MPP, or Multi-Purpose Platform, to 2Excel Aviation, making the UK-based compan>[...]

B1B Lancers Display Readiness During Red Flag-Nellis 25-3

First Red Flag Exercise In Three Years For 9th Bomb Squadron The U.S Air Force’s 9th Bomb Squadron, flying B-1B Lancers out of Dyess Air Force Base in central Texas, recently>[...]

82 Years Later, Texas B-25 Pilot Comes Home To Rest

Charles McCook MIA Since 1943 Mission Over Burma 1st Lt. Charles Woodruff “Woody” McCook was recently brought home to rest, 82 years after he was lost in a low-level mi>[...]

Classic Aero-TV: EAA Introduces Angle of Attack Training

From 2024 (YouTube Edition): Clinic Aimed to Promote Safe Aircraft Control The EAA Pilot Proficiency Center hosted an angle of attack (AOA) training clinic during the 2024 Oshkosh >[...]

ANN's Daily Aero-Linx (08.11.25)

Aero Linx: Civil Aerospace Medical Institute (CAMI) The FAA Civil Aerospace Medical Institute (CAMI) is the medical certification, research, education, and occupational health wing>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC