AD: The Boeing Company Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.08.25

AirborneNextGen-
12.02.25

Airborne-Unlimited-12.03.25

Airborne-FltTraining-12.04.25

AirborneUnlimited-12.05.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sun, Jul 18, 2021

AD: The Boeing Company Airplanes

AD 2021-13-02 Requires Installation Of An Insulation Blanket Assembly

The FAA is adopting a new airworthiness directive (AD) for certain The Boeing Company Model 777-300ER series airplanes.

This AD was prompted by a report that a production design change to certain insulation blankets inadvertently opened up leakage paths for halon and smoke to escape from the aft cargo compartment in the event of a fire. This AD requires installation of an insulation blanket assembly on top of existing insulation blankets in certain areas of the forward endwall in the aft cargo compartment. The FAA is issuing this AD to address the unsafe condition on these products. This AD is effective August 19, 2021.

Supplementary Information: The FAA issued a notice of proposed rulemaking (NPRM) to amend 14 CFR part 39 by adding an AD that would apply to certain The Boeing Company Model 777-300ER series airplanes. The NPRM published in the Federal Register on December 29, 2020 (85 FR 85557).

The NPRM was prompted by report indicating that a production design change to certain insulation blankets inadvertently opened up leakage paths for halon and smoke to escape from the aft cargo compartment in the event of a fire.

In the NPRM, the FAA proposed to require installation of an insulation blanket assembly on top of existing insulation blankets in certain areas of the forward endwall in the aft cargo compartment. The FAA is issuing this AD to address increased leakage paths, which, in the event of a fire, could result in loss of fire suppressant in the cargo compartment, and could lead to an uncontained fire and subsequent loss of the airplane.

FMI: www.regulations.gov

Advertisement

More News

NTSB Final Report: Patriot Aircraft LLC CX1900A

After Draining Both Wing Fuel Tanks, A Significant Amount Of Water Was Observed In The Right Wing Fuel Tank Analysis: The pilot, who was also the owner of the experimental amateur->[...]

Aero-News: Quote of the Day (12.06.25)

“Airbus apologises for any challenges and delays caused to passengers and airlines by this event. The Company thanks its customers, the authorities, its employees and all rel>[...]

ANN's Daily Aero-Term (12.06.25): High Speed Taxiway

High Speed Taxiway A long radius taxiway designed and provided with lighting or marking to define the path of aircraft, traveling at high speed (up to 60 knots), from the runway ce>[...]

ANN's Daily Aero-Linx (12.06.25)

Aero Linx: Taylorcraft Foundation, Inc. The Taylorcraft Foundation is exclusively organized for charitable, educational & scientific activities and will preserve the history an>[...]

Airborne-NextGen 12.02.25: Honda eVTOL, Arctus High-Alt UAS, Samson Patent

Also: USAF Reaper Accident, Baikonur Damage, Horizon eVTOL IFR/FIKI, New Glenn Update Honda has outlined its clearest timeline yet for its entry into the world of electric vertical>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC