Saab Starts Production In Support Of USAF T-7A Program | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.01.25

AirborneNextGen-
12.02.25

Airborne-Unlimited-12.03.25

Airborne-FltTraining-12.04.25

AirborneUnlimited-12.05.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sat, Jan 25, 2020

Saab Starts Production In Support Of USAF T-7A Program

Final Assembly Will Take Place At Boeing Facility In St. Louis

Saab has started assembly production on January 10, 2020 of its section of the T-7A aircraft, the advanced trainer developed and produced together with Boeing for the United States Air Force.

Saab is responsible for the development and production of the aft fuselage section for the advanced trainer, with seven aft units being produced in Linköping, Sweden for final assembly at Boeing’s U.S. facility in St. Louis, MO.

“In little over a year since we signed the EMD contract, we are starting production of our part of the T-7A jet. This achievement is possible due to the great collaboration between Saab and Boeing, and it is an honour to be part of this programme for the United States Air Force,” says Jonas Hjelm, head of Saab business area Aeronautics.

The work is being performed in Linkoping, Sweden, after which future production of Saab’s part for the T-7A will be moved to our new U.S. site in West Lafayette, IN.

The Saab facility in West Lafayette is an important part of Saab’s growth strategy in the United States, creating strong organic capabilities for the development, manufacturing and sales of its products.

Boeing is the designated prime contractor for the T-7A advanced pilot training system acquisition by the U.S. Air Force. Saab and Boeing developed the aircraft with Saab as a risk-sharing partner. Saab received the EMD order from Boeing, on September 18, 2018.

(Image provided with Saab news release)

FMI: www.saabgroup.com

Advertisement

More News

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

NTSB Prelim: Rutan Long-EZ

The Pilot Attempted Several Times To Restart The Engine And Diverted To Long Beach Airport/Daughtery Field On October 20, 2025, about 1603 Pacific daylight time, an experimental am>[...]

ANN's Daily Aero-Term (12.05.25): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

Aero-News: Quote of the Day (12.05.25)

"The latest development underscores the government of Malaysia’s commitment in providing closure to the families affected by this tragedy..." Source: From statements made by >[...]

Airborne-Flight Training 12.04.25: Ldg Fee Danger, Av Mental Health, PC-7 MKX

Also: IAE Acquires Diamond Trainers, Army Drones, FedEx Pilots Warning, DA62 MPP To Dresden Tech Uni The danger to the flight training industry and our future pilots is clear. Dona>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC