Embraer, Brazilian AF To Study Joint Development Of A New Military Transport | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-FlightTraining-07.10.25

AirborneUnlimited-07.11.25

Wed, Jan 01, 2020

Embraer, Brazilian AF To Study Joint Development Of A New Military Transport

Seeks To Identify Alternatives And Solutions To Meet FAB’s Operational Needs

Embraer and the Brazilian Air Force (FAB) has signed a memorandum of understanding which enables the study of the potential development of a new light military transport aircraft.

The study seeks to identify alternatives and solutions to meet FAB’s operational needs, especially in the Amazon region and austere environments, including unpaved, short and damaged runways located in remote areas. Relying on Embraer's high level of innovation and technological capabilities, the study will also seek to explore new technologies to provide solutions to FAB's extreme demands, such as different system architectures, innovative platform solutions, and hybrid-electric propulsion, among others.

FAB, which in 2019 received its first units of the modern KC-390 Millennium, a multi-mission tactical military airlifter, seeks with this study to complement and modernize its transport capabilities in the smaller segments, in order to broadly and completely fulfill Brazil’s needs.

Based on a strong track record of cooperation, that unites Embraer's excellent execution capabilities and FAB's innovative and high-performance requirements, the study will also cover global market demand for the new aircraft.

According to the agreement, Embraer will carry out market studies for the development of the new aircraft, while FAB will provide its expertise in operating aircraft in this segment.

“We are confident that the expertise of the Brazilian Air Force will help us to establish the most appropriate requirements for this study, resulting in an extremely capable aircraft,” said Jackson Schneider, President and CEO of Embraer Defense & Security. “Embraer is more than up for the challenge. Our newest product, the C-390 Millennium multi-mission transport aircraft, is coming into operation, and this new project will be instrumental in maintaining and enhancing Embraer's engineering and technology capabilities to meet the challenging demands of FAB and other customers worldwide.”

“The purpose of this memorandum is to formalize Embraer's intention to develop a light transport aircraft to carry cargo and personnel. The Brazilian Air Force participation is mainly with regard to sharing expertise, based on projects that Embraer and the Brazilian Air Force have already developed in partnership, to meet the Air Force's needs over time," said Lieutenant-Brigadier Antonio Carlos Moretti Bermudez, Brazilian Air Force Commander.

(Image provided with Embraer news release)

FMI: www.embraer.com

Advertisement

More News

Aero-News: Quote of the Day (07.11.25)

“Honored to accept this mission. Time to take over space. Let’s launch.” Source: SecTrans Sean Duffy commenting after President Donald Trump appointed U.S. Secret>[...]

ANN's Daily Aero-Term (07.11.25): Permanent Echo

Permanent Echo Radar signals reflected from fixed objects on the earth's surface; e.g., buildings, towers, terrain. Permanent echoes are distinguished from “ground clutter&rd>[...]

ANN's Daily Aero-Linx (07.11.25)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

NTSB Final Report: Schweizer SGS 2-33A

Glider Encountered A Loss Of Lift And There Was Not Sufficient Altitude To Reach The Airport Analysis: The flight instructor reported that while turning final, the glider encounter>[...]

NTSB Prelim: Aeronca 7AC

Airplane Climbed To 100 Ft Above Ground Level, At Which Time The Airplane Experienced A Total Loss Of Engine Power On May 24, 2025, at 1300 eastern daylight time, an Aeronca 7AC, N>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC