New Airport Hangar Scheduled For John Bell Williams Airport (M16) | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.08.25

AirborneNextGen-
12.09.25

Airborne-Unlimited-12.10.25

Airborne-AffordableFlyers-12.11.25

AirborneUnlimited-12.12.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Wed, May 27, 2009

New Airport Hangar Scheduled For John Bell Williams Airport (M16)

A new hangar to accommodate growing storage demand by large twin-engine aircraft and business jet owners has completed the design stage and will begin construction this month with available occupancy for a tenant this fall, thanks to a multi-modal grant from the Mississippi Department of Transportation.

The hangar, designed by Airport Development Group Inc., is a 100-x-100-foot facility that is large enough to hold a Gulfstream IV business jet, said Michelle Jackson, airport manager. The new $700,000 building will have an 80-foot wide by 26-foot tall hangar door to allow for fast access to the aircraft and will have an additional 1,000 square feet of office space in front which can be modified to meet the needs of a tenant.

"As business aviation continues to rebound from these challenging economic times, we're very pleased to be in a position to grow our airfield field facilities and offer these needed services to our customers," Jackson said.

The airport is owned by Hinds Community College serving approximately 19,500 students each year at six different locations. Hinds offers aviation technology programs at the airport - such as pilot training, aviation management, avionics, airframe and powerplant certification - and an air traffic control training curriculum that started in the spring 2009 semester.

John Bell Williams Airport is in the final stages of an $11 million capital improvement program that has included reconstruction and lengthening of its runway and taxiway to accommodate a greater percentage of the worldwide business jet fleet. They will complete the installation of an instrument landing system in summer 2010 that transforms the facility into an all-weather airport.

"Our airport is ideally located in the rapidly growing suburban areas west of Jackson. We are perfectly positioned to offer a dynamic combination of aviation service and business locations to serve this region of the state," Jackson said.

FMI: www.jbwairport.com

Advertisement

More News

ANN's Daily Aero-Linx (12.12.25)

Aero Linx: Commercial Aviation Safety Team (CAST) Founded in 1997, the Commercial Aviation Safety Team (USCAST) has developed an integrated, data-driven strategy to reduce the comm>[...]

ANN's Daily Aero-Term (12.12.25): Land And Hold Short Operations

Land And Hold Short Operations Operations that include simultaneous takeoffs and landings and/or simultaneous landings when a landing aircraft is able and is instructed by the cont>[...]

ANN FAQ: How Do I Become A News Spy?

We're Everywhere... Thanks To You! Even with the vast resources and incredibly far-reaching scope of the Aero-News Network, every now and then a story that should be reported on sl>[...]

NTSB Final Report: Cirrus Design Corp SF50

Pilot’s Inadvertent Use Of The Landing Gear Control Handle Instead Of The Flaps Selector Switch During The Landing Rollout Analysis: The pilot reported that during the landin>[...]

Airborne 12.08.25: Samaritan’s Purse Hijack, FAA Med Relief, China Rocket Fail

Also: Cosmonaut Kicked Out, Airbus Scales Back, AF Silver Star, Russian A-60 Clobbered A Samaritan’s Purse humanitarian flight was hijacked on Tuesday, December 2, while atte>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC