NASA Seeks A Possible Delay In Final Shuttle Flights | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Thu, Jun 24, 2010

NASA Seeks A Possible Delay In Final Shuttle Flights

Last Launch Would Be In February Of Next Year

The final two space shuttle flights may be delayed by several months, extending the program until February of next year.

NASA mission managers have proposed that the final Discovery launch (STS-133) be pushed to October 29th, and the last Endeavour liftoff, which would be the end of the program, not be attempted until February 28th, 2011.

Space.com reports that NASA spokesperson Mike Curie that the proposal will be reviewed by all parties involved, including the ISS program, the astronaut office, and mission controllers. "It's being discussed, but there has been no decision made yet," he said.

Fox news reports that Curie said NASA needs a little more time to get some spare hardware ready to fly on Discovery. One of the primary objectives of the STS-133 mission is to deliver spare parts for the Leonardo module. It is also supposed to take a humanoid robot to the station.

The Endeavour mission has the $1.5 billion Alpha Magnetic Spectrometer on its manifest, but scientists have determined that a key component of the device needs to be replaced before it is 'shipped'. They are installing a more permanent magnet that will allow the device to have a longer service life.

But the spectrometer is not the cause for proposing a delay in the STS-134 mission. Curie said it's a matter of scheduling. If Discovery is delayed until October, the facility can't be ready to launch another shuttle in November, and February really becomes the next available launch window due to astronomic conditions, as well as Russian manned and unmanned ships scheduled to be docked at the station.

FMI: www.nasa.gov

Advertisement

More News

NTSB Prelim: Funk B85C

According To The Witness, Once The Airplane Landed, It Continued To Roll In A Relatively Straight Line Until It Impacted A Tree In His Front Yard On November 4, 2025, about 12:45 e>[...]

Aero-News: Quote of the Day (11.21.25)

"In the frame-by-frame photos from the surveillance video, the left engine can be seen rotating upward from the wing, and as it detaches from the wing, a fire ignites that engulfs >[...]

ANN's Daily Aero-Term (11.21.25): Radar Required

Radar Required A term displayed on charts and approach plates and included in FDC NOTAMs to alert pilots that segments of either an instrument approach procedure or a route are not>[...]

Classic Aero-TV: ScaleBirds Seeks P-36 Replica Beta Builders

From 2023 (YouTube Edition): It’s a Small World After All… Founded in 2011 by pilot, aircraft designer and builder, and U.S. Air Force veteran Sam Watrous, Uncasville,>[...]

Airborne 11.21.25: NTSB on UPS Accident, Shutdown Protections, Enstrom Update

Also: UFC Buys Tecnams, Emirates B777-9 Buy, Allegiant Pickets, F-22 And MQ-20 The NTSB's preliminary report on the UPS Flight 2976 crash has focused on the left engine pylon's sep>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC