Lockheed Martin C-130J Program Marks Two Major Milestones | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.03.25

AirborneNextGen-
11.04.25

Airborne-Unlimited-11.05.25

Airborne-Unlimited-11.06.25

AirborneUnlimited-10.17.25

Affordable Flying Expo Tickets (Discount Code: AFE2025): CLICK HERE!
LIVE MOSAIC Town Hall, 1800ET, 11.07.25: www.airborne-live.net

Wed, Oct 07, 2009

Lockheed Martin C-130J Program Marks Two Major Milestones

200th Aircraft Will Be Equipped To Support Special Missions

Lockheed Martin began final assembly of the first HC/MC-130J Monday, which will also be the 200th C-130J to be produced. U.S. Air Force and company officials commemorated the milestones during a short ceremony on the production line by signing the keel of the historic C-130J that will be delivered in 2010.

"Again we see the C-130 setting new standards for mission flexibility," said Ross Reynolds, vice president of Lockheed Martin C-130 programs. "This new Special Mission configuration of the proven C-130J will give the U.S. Air Force unparalleled capability for Combat Search and Rescue, Personnel Recovery and Special Operations Missions. As demand for the C-130J continues to grow around the world, we will see more and more the way this aircraft can meet the demands of any operator and mission."

Lockheed Martin is under contract to the U.S. Air Force to build the HC/MC-130J Special Mission Hercules to replace aging fleets of Combat Search and Rescue HC-130s and Air Force Special Operations MC-130s. In April 2008, a Department of Defense Acquisition Decision Memorandum (ADM) was signed to start the HC/MC-130J program with a six-aircraft buy. Since that time, six more aircraft have been placed on contract and the latest ADM, signed on Aug. 26, 2009, authorized up to 22 HC/MC130J aircraft.

The new aircraft, based on a KC-130J tanker baseline, will have a host of factory installed provisions to support special mission operations. These include the Enhanced Service Life Wing, the Enhanced Cargo Handling System, a Universal Aerial Refueling Receptacle Slipway Installation (boom refueling receptacle), an Electro-Optic/Infrared Sensor, a Combat Systems Operator Station on the flight deck, dual military SATCOMs, Enhanced Vision System provisions, and higher capacity 60/90 kilovolt amp (KVA) generators. In-line production of this configuration reduces cost and schedule, allowing the aircraft to meet the required 2012 Initial Operational Capability.

FMI: www.lockheedmartin.com

Advertisement

More News

Airborne-NextGen 11.04.25: Anduril YFQ-44A, Merlin SOI 2, UAV Rulemaking Stalled

Also: Horizon Picks P&W PT6A, Army Buys 3 EagleNXT, First Hybrid-Electric Regional, Army Selects AEVEX Anduril Industries’ YFQ-44A Collaborative Combat Aircraft was flown>[...]

NTSB Prelim: Elmore Travis C Searey

While Flying North Along The Beach At About 300 Ft Above Ground Level, The Pilot Reported That The Engine RPM Dropped To About Idle On September 28, 2025, at 1126 eastern daylight >[...]

ANN's Daily Aero-Linx (11.03.25)

Aero Linx: European Association of Aviation Training and Educational Organisations (EATEO) Welcome to the “ European Association of Aviation Training and Education Organizati>[...]

ANN's Daily Aero-Term (11.03.25): On-Course Indication

On-Course Indication An indication on an instrument, which provides the pilot a visual means of determining that the aircraft is located on the centerline of a given navigational t>[...]

Aero-News: Quote of the Day (11.03.25)

“It also gives us the hard data we need to shape requirements, reduce risk, and ensure the CCA program delivers combat capability on a pace and scale that keeps us ahead of t>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC