AD: BAE Systems (Operations) Limited Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.09.24

Airborne-Unlimited-09.03.24

Airborne-NextGen-09.04.24

Airborne-Unlimited-09.05.24

Airborne-Affordable Flyers-09.06.24

Fri, May 14, 2021

AD: BAE Systems (Operations) Limited Airplanes

AD 2021-10-27 Requires Replacing Each Honeywell Emergency Light Power Unit Having A Certain Part Number

The FAA is adopting a new airworthiness directive (AD) for all BAE Systems (Operations) Limited Model BAe 146 and Model Avro 146-RJ series airplanes.

This AD was prompted by a report indicating that during a routine battery capacity check on the emergency light power units, the printed circuit boards (PCBs) for certain power units were found to show signs of burning. This AD requires replacing each Honeywell emergency light power unit having a certain part number with a serviceable emergency light power unit. The FAA is issuing this AD to address the unsafe condition on these products. This AD is effective June 17, 2021.

Supplementary Information: The European Union Aviation Safety Agency (EASA), which is the Technical Agent for the Member States of the European Union, has issued EASA AD 2020-0237, dated October 28, 2020 (EASA AD 2020-0237) (also referred to as the Mandatory Continuing Airworthiness Information, or the MCAI), to correct an unsafe condition for all BAE Systems (Operations) Limited Model BAe 146 and Model Avro 146-RJ series airplanes. You may examine the MCAI in the AD docket at https://www.regulations.gov by searching for and locating Docket No. FAA-2021-0138.

The FAA issued a notice of proposed rulemaking (NPRM) to amend 14 CFR part 39 by adding an AD that would apply to all BAE Systems (Operations) Limited Model BAe 146 and Model Avro 146-RJ series airplanes. The NPRM published in the Federal Register on March 15, 2021 (86 FR 14283). The NPRM was prompted by a report indicating that during a routine battery capacity check on the emergency light power units, the PCBs for certain power units were found to show signs of burning. The NPRM proposed to require replacing each Honeywell emergency light power unit having a certain part number with a serviceable emergency light power unit. The FAA is issuing this AD to address heat damage of the PCBs, which could lead to battery discharge and possibly result in lack of power supply to the emergency light units when needed. See the MCAI for additional background information.

FMI: www.regulations.gov

Advertisement

More News

ANN's Daily Aero-Term (09.06.24): Emergency Locator Transmitter (ELT)

Emergency Locator Transmitter (ELT) A radio transmitter attached to the aircraft structure which operates from its own power source on 121.5 MHz and 243.0 MHz. It aids in locating >[...]

Aero-News: Quote of the Day (09.06.24)

“That’s really what makes you upset is that you are in the middle of flying an aircraft, other people on board you are responsible for and it really impacts the safety.>[...]

ANN's Daily Aero-Linx (09.06.24)

Aero Linx: KC-10 Extender The KC-10 Extender is an Air Mobility Command advanced tanker and cargo aircraft designed to provide increased global mobility for U.S. armed forces. Alth>[...]

Classic Aero-TV: Profiles in Aviation - Aaron Singer’s Nanchang CJ-6A

From 2009 (YouTube Version): From China to Wittman Field, Singer Introduces the Nanchang CJ-6A From 1954 until 1958, the Nanchang Aircraft Factory build the Soviet Yak-18 under lic>[...]

Airborne-Flight Training 08.29.24: Marshall U Flies, Texas Womens U, AMT Program

Also: First Nations Tech, 99s Receive Big Donation, AI Safety, Atlantic Aviation OKC & GIAD Registration recently opened for Marshall University’s new Bill Noe Flight Sch>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC