Ariane 5 For January 27 Mission Delivered To Final Assembly Building | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.08.25

AirborneNextGen-
12.02.25

Airborne-Unlimited-12.03.25

Airborne-FltTraining-12.04.25

AirborneUnlimited-12.05.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Wed, Jan 13, 2016

Ariane 5 For January 27 Mission Delivered To Final Assembly Building

Launcher And Payload Preparations Continue For First Flight Of 2016

Ariane 5 launcher and payload preparations are in progress in French Guiana for Arianespace's first flight of 2016, which will orbit the initial EpicNG high-throughput satellite for global operator Intelsat.

The heavy-lift vehicle for this upcoming mission - designated Flight VA228 - is now located inside the Spaceport's Final Assembly Building following its transfer by rail from the Launcher Integration Building atop a mobile launch table.

With Ariane 5 now under Arianespace's responsibility, the launcher is in position to receive its Intelsat 29e payload - which will be followed by final verifications and subsequent rollout to the Spaceport's ELA-3 complex for a January 27 liftoff.

Intelsat 29e's own preparations are advancing in parallel activity at the Spaceport's S5 payload processing building. Having already completed its initial check-out process inside this state-of-the-art facility's S5C clean room, the Boeing-built satellite is now being transferred to the S5A fueling and integration hall.

The January 27 liftoff will kick off another busy year of mission activity for Arianespace, which is targeting a 2016 performance of up to 11 flights using its full launcher family - consisting of the heavy-lift Ariane 5, medium-lift Soyuz and lightweight Vega - in side-by-side operation at the Spaceport.

(Image provided with Arianespace news release)

FMI: www.arianespace.com

Advertisement

More News

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

NTSB Prelim: Rutan Long-EZ

The Pilot Attempted Several Times To Restart The Engine And Diverted To Long Beach Airport/Daughtery Field On October 20, 2025, about 1603 Pacific daylight time, an experimental am>[...]

ANN's Daily Aero-Term (12.05.25): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

Aero-News: Quote of the Day (12.05.25)

"The latest development underscores the government of Malaysia’s commitment in providing closure to the families affected by this tragedy..." Source: From statements made by >[...]

Airborne-Flight Training 12.04.25: Ldg Fee Danger, Av Mental Health, PC-7 MKX

Also: IAE Acquires Diamond Trainers, Army Drones, FedEx Pilots Warning, DA62 MPP To Dresden Tech Uni The danger to the flight training industry and our future pilots is clear. Dona>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC