NBAA: China’s Draft Five-Year Plan Envisions GA Infrastructure Boost | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-FlightTraining-07.10.25

AirborneUnlimited-07.11.25

Tue, Aug 11, 2015

NBAA: China’s Draft Five-Year Plan Envisions GA Infrastructure Boost

Construction Of 58 Additional Airports Projected By 2020

Chinese officials are planning to spend billions more on aviation infrastructure, including new general aviation (GA) facilities, according to the country’s next five-year plan, which is expected to be drafted by October, and finalized in March 2016.

According to the NBAA, the planning director for the Civil Aviation Administration of China (CAAC), Zhangyi Wang, said the draft plan anticipates more than 260 major and regional airports by 2020, up from the current 202. Current large-scale projects include the new $12.87 billion Beijing Daxing International Airport, targeted to open in 2018, and a new international airport in Chengdu, Sichuan Province.

The head of the CAAC, Li Jiaxiang, has heralded the potential for general aviation to boost the economy; and mentioned the possibility of building up to 2,800 general aviation aerodromes. China currently has 78.
 
“The development of general aviation will... provide an impetus for emerging industries like private jet manufacturing and air ambulances,” predicted Li Xiaojin, a professor at the Civil Aviation University of China.
 
The new aviation infrastructure is part of the land-based Silk Road Economic Belt – including roads and rail lines, energy pipelines and power stations – that is envisioned to extend west to improve economic connections with Central Asia, the Middle East and Europe.
 
“Certainly the tone from the top is one that we want, talking about expanding the infrastructure, expanding airspace access, making it easier to fly,” said Ty Dubay, president of NetJets China and a member of the board of governors of the Asian Business Aviation Association (AsBAA). “Basically, the government is saying the right things. They’re doing the right things. It is not quick or easy to execute such important plans.”

Two caveats about the emphasis on GA aerodromes are runway length and operating altitudes, noted Doug Carr, NBAA’s vice president of regulatory and international affairs. GA airports are currently built with runways that are 3,281 feet long, too short for most business jets.

“AsBAA is working with aviation officials to encourage construction of longer runways that can support larger business aircraft,” noted Carr, who added, “China will need to increase the permissible altitudes, as well, to facilitate greater business aviation use.” The GA ceiling was raised to 3,281 feet a year ago, and industry leaders are hoping the next step will be to 9,843 feet.
 
“What is pertinent is getting the model right to recognize different business sector needs in China and its growth trajectory,” said David Best, vice chairman of AsBAA.

(Images provided by NBAA)

FMI: www.nbaa.org

Advertisement

More News

Aero-News: Quote of the Day (07.11.25)

“Honored to accept this mission. Time to take over space. Let’s launch.” Source: SecTrans Sean Duffy commenting after President Donald Trump appointed U.S. Secret>[...]

ANN's Daily Aero-Term (07.11.25): Permanent Echo

Permanent Echo Radar signals reflected from fixed objects on the earth's surface; e.g., buildings, towers, terrain. Permanent echoes are distinguished from “ground clutter&rd>[...]

ANN's Daily Aero-Linx (07.11.25)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

NTSB Final Report: Schweizer SGS 2-33A

Glider Encountered A Loss Of Lift And There Was Not Sufficient Altitude To Reach The Airport Analysis: The flight instructor reported that while turning final, the glider encounter>[...]

NTSB Prelim: Aeronca 7AC

Airplane Climbed To 100 Ft Above Ground Level, At Which Time The Airplane Experienced A Total Loss Of Engine Power On May 24, 2025, at 1300 eastern daylight time, an Aeronca 7AC, N>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC