All Metal MS Unveils 'Safety First' Robinson Maintenance Stand | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.15.25

AirborneNextGen-
09.09.25

Airborne-Unlimited-09.10.25

Airborne-AffordableFlyers-09.11.25

AirborneUnlimited-09.12.25

Wed, Jan 13, 2016

All Metal MS Unveils 'Safety First' Robinson Maintenance Stand

First Unit Delivered To 702 Helicopters In Las Vegas

All Metal MS, a global leader in the design and manufacturing of solution-driven, custom “Safety First” maintenance stands, hangar equipment, portable field equipment and specialty tooling, announced today the unveiling of its “Safety First” Robinson R22, R44, R66 Maintenance Stand (RW-SS-ROB66) which was delivered to 702 Helicopters located in Las Vegas.

The  Robinson R22, R44, R66 Maintenance Stand, is specifically designed to be an extremely cost effective product line that highly increases the efficiency and safety for the mechanics working on the aircraft. The custom “Safety First” maintenance stand can be easily erected and maneuvered into place by one person, as well as, collapsed down for efficient storage in the hangar and/or for shipping.  702 Helicopters in Las Vegas, NV took delivery of the first maintenance stand for utilization on their fleet of various Robinson Helicopter models.

Johnny Buscema, All Metal president and CEO, comments: “Utilizing All Metal’s innovative design capabilities, which strived to optimize the functionality of the stand to ensure effortless usability and superior stability of the platform, reinforces All Metal’s motto of  “Customized for Efficiency… Built for Safety!”.  The  Robinson R22, R44, R66 Maintenance Stand was designed with durable integrity at a very cost effective price point.”

(Image provided with All Metal MS news release)

FMI: www.allmetalms.com/robinson

Advertisement

More News

NTSB Final Report: Evektor-Aerotechnik A S Harmony LSA

Improper Installation Of The Fuel Line That Connected The Fuel Pump To The Four-Way Distributor Analysis: The airplane was on the final leg of a flight to reposition it to its home>[...]

ANN's Daily Aero-Term (09.15.25): Decision Altitude (DA)

Decision Altitude (DA) A specified altitude (mean sea level (MSL)) on an instrument approach procedure (ILS, GLS, vertically guided RNAV) at which the pilot must decide whether to >[...]

Aero-News: Quote of the Day (09.15.25)

“With the arrival of the second B-21 Raider, our flight test campaign gains substantial momentum. We can now expedite critical evaluations of mission systems and weapons capa>[...]

Airborne 09.12.25: Bristell Cert, Jetson ONE Delivery, GAMA Sales Report

Also: Potential Mars Biosignature, Boeing August Deliveries, JetBlue Retires Final E190, Av Safety Awareness Czech plane maker Bristell was awarded its first FAA Type Certification>[...]

Airborne 09.10.25: 1000 Hr B29 Pilot, Airplane Pile-Up, Haitian Restrictions

Also: Commercial A/C Certification, GMR Adds More Bell 429s, Helo Denial, John “Lucky” Luckadoo Flies West CAF’s Col. Mark Novak has accumulated more than 1,000 f>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC