Aussie Metroliner Had Previous Engine Woes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Tue, May 10, 2005

Aussie Metroliner Had Previous Engine Woes

But Transair Australia Says It Had Flown 60 Hours Since Repairs

A Fairchild Metroliner that went down in Queensland, Australia, over the weekend was in the maintenance shop just last month after suffering a power loss, authorities said Monday.

"The pilots as part of their procedures check their instruments and follow procedures, and on this occasion the power output from that engine did not meet requirements," Transair Australia Duncan MacKellar told The Age newspaper. "It certainly wasn't an engine failure. They made some adjustments and the flight took off about an hour and a half later."

Since then, there had been no reports of problems with that particular engine, MacKellar said. "It would be speculation that I don't want to enter into (to try to link the engine problem to Saturday's crash)."

The Metroliner impacted a 1,600-foot tall peak in a Queensland rainforest Saturday while on approach to the airport at Lockhart River after departing Bamaga. All 15 people on board were lost.

MacKeller told the Age regular commuter flights from Cairns to Bamaga and the Cape York Peninsula have been suspended out of respect for the victims. He gave no indication when those flights will resume.

FMI: www.atsb.gov.au

Advertisement

More News

Airborne 05.10.24: Icon Auction, Drunk MedEvac Pilot, Bell ALFA

Also: SkyReach Parts Support, Piper Service Ctr, Airliner Near-Miss, Airshow London The Judge overseeing Icon's convoluted Chapter 11 process has approved $9 million in Chapter 11 >[...]

ANN's Daily Aero-Term (05.13.24): ILS PRM Approach

ILS PRM Approach An instrument landing system (ILS) approach conducted to parallel runways whose extended centerlines are separated by less than 4,300 feet and at least 3,000 feet >[...]

ANN's Daily Aero-Linx (05.13.24)

Aero Linx: FlyPups FlyPups transports dogs from desperate situations to fosters, no-kill shelters, and fur-ever homes. We deliver trained dogs to veterans for service and companion>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Airborne 05.08.24: Denali Update, Dad-Daughter Gyro, Lake SAIB

Also: NBAA on FAA Reauth, DJI AG Drones, HI Insurance Bill Defeated, SPSA Airtankers The Beechcraft Denali continues moving forward towards certification, having received its FAA T>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC