AD: Saab AB, Saab Aeronautics Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Fri, Sep 14, 2018

AD: Saab AB, Saab Aeronautics Airplanes

AD NUMBER: 2018-18-17

PRODUCT: Certain Saab AB, Saab Aeronautics Model 340A (SAAB/SF340A) and SAAB 340B airplanes.

ACTION: Final Rule.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2016-13-06, which applied to the airplanes listed above.

AD 2016-13-06 required a revision of the applicable airplane flight manual (AFM), repetitive inspections of the horizontal stabilizer de-icing boots, and applicable corrective actions. This AD continues to require a revision of the applicable AFM, repetitive inspections of the horizontal stabilizer de-icing boots, and applicable corrective actions.

This AD also requires replacement of single stitched de- icing boots with improved double stitched boots, and re-identification of the modified horizontal stabilizer leading edge.

This AD was prompted by reports of ruptured horizontal stabilizer de-icing boots.

DATES: This AD is effective October 18, 2018.

COST: The FAA estimates estimate that this AD affects 51 airplanes of U.S. registry.  

The actions required by AD 2016-13-06, and retained in this AD take about 6 work-hours per product, at an average labor rate of $85 per workhour. Based on these figures, the estimated cost of the actions that are required by AD 2016-13-06 is $510 per product.

In addition:

  • The FAA estimates that any necessary follow-on actions required by AD 2016-13-06, and retained in this AD take about 6 work-hours and require parts costing $9,500, for a cost of $10,010 per product. There is no way for the FAA to determine the number of aircraft that might need these actions.
  • The FAA also estimate that it would take about 6 work-hours per product to comply with the basic requirements of this AD. The average labor rate is $85 per work-hour. Required parts would cost about $13,500 per product. Based on these figures, the estimated the cost of this AD on U.S. operators to be $714,510, or $14,010 per product.
FMI: AD

Advertisement

More News

Aero-News: Quote of the Day (11.18.25)

“Setting eight speed records this quickly following its August entry into service is a powerful testament to the tremendous capabilities of this aircraft. We are already seei>[...]

ANN's Daily Aero-Term (11.18.25): On-Course Indication

On-Course Indication An indication on an instrument, which provides the pilot a visual means of determining that the aircraft is located on the centerline of a given navigational t>[...]

ANN's Daily Aero-Linx (11.18.25)

Aero Linx: WW1 Aeroplanes, Inc. WORLD WAR 1 AEROPLANES was founded by Leo Opdycke in 1961 and incorporated as a federally recognized 501 (c) (3) not-for-profit corporation in 1979,>[...]

NTSB Final Report: Shoemaker Ronald R Pazmany PL-2

Pilot Reported That He Purchased The Airplane Earlier That Day Analysis: The pilot reported that he purchased the airplane earlier that day and completed a condition inspection tha>[...]

Airborne-NextGen 11.18.25: Dream Chaser Preps, Joby eTurbine, UAE Flt Test

Also: Abu Dhabi’s 1st Vertiport Network, Anduril-EDGE Partner, Vertical Permit/eVTOL Regs Sierra Space’s Dream Chaser spaceplane has cleared another round of pre-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC