Lafayette Regional Airport Breaks Ground On $5.1 Million Cargo Facility | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sun, Jan 24, 2016

Lafayette Regional Airport Breaks Ground On $5.1 Million Cargo Facility

Will House Operations For FedEx, UPS

Lafayette Regional Airport broke ground today on a $5.1 million cargo facility that FedEx and UPS will begin operating out of by the end of the year. Trahan Construction of Lake Arthur was selected to do the construction project.

The project includes two buildings – one for FedEx and the other for UPS. The FedEx building will be just over 4,700 square feet while the UPS building will be just over 3,900 square feet. A Louisiana State Capital Outlay grant will fund $4.9 million of the construction costs, and the Lafayette Airport Commission will fund the remainder. Construction will begin shortly and is scheduled to be complete by September, 2016.

The site of the project is along US Highway 90, just south of PHI’s facility.  Construction of a 60,000 square foot, 900-foot long by 500-foot wide cargo apron large enough to hold several large cargo planes was completed in late 2011, and the new facility will be built on that site. The two cargo carriers currently operate out of an old hangar next to the terminal that will be torn down to make way for the New LFT Terminal.

"Last year, 25.8 million pounds of cargo was loaded and unloaded at Lafayette Regional Airport,” says Lafayette Airport Commission Chairman Paul A. Guilbeau. "The new cargo facility will allow us to move cargo activity away from the terminal building, improving safety and passenger carrier operations.”

(Source: Lafayette Regional Airport news release. Images from file)

FMI: www.lftairport.com


Advertisement

More News

NTSB Prelim: Funk B85C

According To The Witness, Once The Airplane Landed, It Continued To Roll In A Relatively Straight Line Until It Impacted A Tree In His Front Yard On November 4, 2025, about 12:45 e>[...]

Aero-News: Quote of the Day (11.21.25)

"In the frame-by-frame photos from the surveillance video, the left engine can be seen rotating upward from the wing, and as it detaches from the wing, a fire ignites that engulfs >[...]

ANN's Daily Aero-Term (11.21.25): Radar Required

Radar Required A term displayed on charts and approach plates and included in FDC NOTAMs to alert pilots that segments of either an instrument approach procedure or a route are not>[...]

Classic Aero-TV: ScaleBirds Seeks P-36 Replica Beta Builders

From 2023 (YouTube Edition): It’s a Small World After All… Founded in 2011 by pilot, aircraft designer and builder, and U.S. Air Force veteran Sam Watrous, Uncasville,>[...]

Airborne 11.21.25: NTSB on UPS Accident, Shutdown Protections, Enstrom Update

Also: UFC Buys Tecnams, Emirates B777-9 Buy, Allegiant Pickets, F-22 And MQ-20 The NTSB's preliminary report on the UPS Flight 2976 crash has focused on the left engine pylon's sep>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC