Rectrix MRO Completes Rockwell Collins Proline 21 Advanced Upgrade Installation | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Mon, Jun 25, 2018

Rectrix MRO Completes Rockwell Collins Proline 21 Advanced Upgrade Installation

Makes Aircraft Compliant With 2020 ADS-B Equipage Deadline

Rectrix MRO, Inc., an FAA Part 145 Repair Station located at Westfield-Barnes Regional Airport (KBAF), recently completed a Rockwell Collins ProLine 21 Advanced upgrade installation for a customer’s Bombardier Challenger 300 with a flawless operational check flight following the aircraft’s release. The complex upgrade makes the aircraft compliant with upcoming FAA NextGen avionics requirements and updates the avionics suite to the latest technology available for that airframe.

During the Proline 21 Advanced installation, Rectrix MRO also outfitted the aircraft with a new dual IFIS system, ADS-B Out, FANs 1A+ over Iridium Datalink, Remote Database dataloader, cabin refurbishment, and a 12/24/48 month inspection.

“This project, essentially the complete removal and installation of all new flight control, guidance, and communication systems demonstrates the technical expertise and breadth of capabilities available at Rectrix MRO,” said Kevin Bradley, Rectrix Vice President of Operations.

“With NextGen deadlines fast approaching, aircraft owners must take steps to prepare their older aircraft to meet the FAA requirements,” said Sherry Talbert, Rectrix MRO Director of Maintenance. “We were pleased to complete this work on time and within budget and are proud to say that the test flight went flawlessly with zero squawks, a true testament to the capabilities of the maintenance team.”

The FAA’s ADS-B requirements for all aircraft flying in controlled airspace go into effect January 1, 2020. ADS-B requirements will take effect in Europe June 7, 2020. Last year Rectrix MRO expanded its services for Rockwell Collins-equipped aircraft and today Rectrix MRO can service nearly every avionics need of most business and regional aircraft.

(Source: Rectrix MRO news release. Images provided)

FMI: rectrix.aero

Advertisement

More News

NTSB Final Report: Rutan Long-EZ

He Attempted To Restart The Engine Three Times. On The Third Restart Attempt, He Noticed That Flames Were Coming Out From The Right Wing Near The Fuel Cap Analysis: The pilot repor>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

Classic Aero-TV: ICAS Perspectives - Advice for New Air Show Performers

From 2009 (YouTube Edition): Leading Air Show Performers Give Their Best Advice for Newcomers On December 6th through December 9th, the Paris Las Vegas Hotel hosted over 1,500 air >[...]

ANN's Daily Aero-Linx (06.28.25)

Aero Linx: NASA ASRS ASRS captures confidential reports, analyzes the resulting aviation safety data, and disseminates vital information to the aviation community. The ASRS is an i>[...]

Aero-News: Quote of the Day (06.28.25)

“For our inaugural Pylon Racing Seminar in Roswell, we were thrilled to certify 60 pilots across our six closed-course pylon race classes. Not only did this year’s PRS >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC