Boeing Celebrates Grand Opening Of 777X Composite Wing Center | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Tue, May 24, 2016

Boeing Celebrates Grand Opening Of 777X Composite Wing Center

Investment Of More Than $1 Billion Sustains Thousands Of Puget Sound Jobs

Boeing employees recently joined with community leaders from across the region to celebrate the grand opening of its new 777X Composite Wing Center (CWC) in Everett, WA.

The facility, located on the north side of the main final assembly building, will manufacture the world's largest composite wings for the 777X, the company's newest commercial jetliner, and sustain thousands of Puget Sound area jobs.

Boeing has invested more than $1 billion in the Everett site for construction and outfitting of the new building. "[This] event is bigger than celebrating the opening of a magnificent new building," said Boeing Commercial Airplanes President and CEO Ray Conner. "It's about our employees, and shared success with our partners around the region and in Olympia in keeping the Puget Sound at the forefront of aerospace leadership for decades to come."

Construction of the new CWC building required approximately 4.2 million hours of construction time. At its peak, 1,700 contract employees worked on the project. By the numbers, the new building required:

  • 31,000 tons of steel with the highest beams weighing 720 pounds per foot.
  • 480 miles of electrical cable.
  • 80,000 linear feet of process piping.
  • 170,000 cubic yards of concrete were poured. The concrete was brought to the site by more than 16,500 truckload deliveries.

The CWC is more than 27 acres under one roof – the equivalent to 24 football fields. It will contain three of the world's largest autoclaves – each big enough to fit two Boeing 737 fuselages inside.

To date, the 777X has accumulated 320 orders and commitments from six customers worldwide. Production of the 777X is scheduled to begin in 2017, with first delivery targeted in 2020.

(Source: Boeing news release. Images from file)

FMI: www.boeing.com

Advertisement

More News

NTSB Prelim: Funk B85C

According To The Witness, Once The Airplane Landed, It Continued To Roll In A Relatively Straight Line Until It Impacted A Tree In His Front Yard On November 4, 2025, about 12:45 e>[...]

Aero-News: Quote of the Day (11.21.25)

"In the frame-by-frame photos from the surveillance video, the left engine can be seen rotating upward from the wing, and as it detaches from the wing, a fire ignites that engulfs >[...]

ANN's Daily Aero-Term (11.21.25): Radar Required

Radar Required A term displayed on charts and approach plates and included in FDC NOTAMs to alert pilots that segments of either an instrument approach procedure or a route are not>[...]

Classic Aero-TV: ScaleBirds Seeks P-36 Replica Beta Builders

From 2023 (YouTube Edition): It’s a Small World After All… Founded in 2011 by pilot, aircraft designer and builder, and U.S. Air Force veteran Sam Watrous, Uncasville,>[...]

Airborne 11.21.25: NTSB on UPS Accident, Shutdown Protections, Enstrom Update

Also: UFC Buys Tecnams, Emirates B777-9 Buy, Allegiant Pickets, F-22 And MQ-20 The NTSB's preliminary report on the UPS Flight 2976 crash has focused on the left engine pylon's sep>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC