Uh, Oooopss... Problems With Virgin Galactic Flight 06 Reported to FAA | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.15.25

AirborneNextGen-
09.09.25

Airborne-Unlimited-09.10.25

Airborne-AffordableFlyers-09.11.25

AirborneUnlimited-09.12.25

Wed, Feb 07, 2024

Uh, Oooopss... Problems With Virgin Galactic Flight 06 Reported to FAA

Post-Flight Review Found An Alignment Pin Detached From The Mothership 

Virgin Galactic has admitted that during 'routine post-flight reviews' following its most recent spaceflight, ‘Galactic 06,’ the Company became aware that an alignment pin detached from the launch pylon of our mothership, VMS Eve, during flight. 

The Company notified the FAA on January 31 in accordance with regulations and is conducting a review in conjunction with the FAA.

The VG statement associated with this news asserts that "‘Galactic 06’ was a safe and successful flight that was conducted in accordance with Virgin Galactic’s rigorous flight procedures and protocols. At no time did the detached alignment pin pose a safety impact to the vehicles or the crew on board. Virgin Galactic flights occur in restricted airspace and at specific geographical launch locations that control the hazards to people or structures on the ground. The Company also observed no damage to the spaceship or the mothership."

The alignment pin helps ensure the spaceship is aligned to the mothership when mating the vehicles on the ground during pre-flight procedures. During mated flight, as the vehicles climb towards release altitude, the alignment pin helps transfer drag and other forces from the spaceship to the shear pin fitting assembly and into the pylon and center wing of the mothership. The shear pin fitting assembly remained both attached and intact on the mothership with no damage. While both parts play a role during mated flight, they do not support the spaceship’s weight, nor do they have an active function once the spaceship is released.

The alignment pin and shear pin fitting assembly reportedly performed as designed during the mated portion of the flight, and only the alignment pin detached after the spaceship was released from the mothership.

Virgin Galactic promises a further update at the completion of the review and will confirm the flight window for the ‘Galactic 07’ mission, which is planned for the second quarter of 2024.

FMI: www.virgingalactic.com

Advertisement

More News

Classic Aero-TV: UAvionix - Transitioning Between Manned & Unmanned Technologies

From 2017 (YouTube Edition): ADS-B For Airplanes And Drones… ADS-B technology developed by uAvionix has come full circle. The company began with a device developed for manne>[...]

ANN's Daily Aero-Term (09.14.25): Dead Reckoning

Dead Reckoning Dead reckoning, as applied to flying, is the navigation of an airplane solely by means of computations based on airspeed, course, heading, wind direction, and speed,>[...]

Aero-News: Quote of the Day (09.14.25)

"The next great technological revolution in aviation is here. The United States will lead the way, and doing so will cement America’s status as a global leader in transportat>[...]

ANN's Daily Aero-Linx (09.14.25)

Aero Linx: The Mooney Mite Site Dedicated to the Mooney M-18 Mite, "The Most Personal Airplane," and to supporting Mite owners everywhere. The Mooney M-18 Mite is a single-place, l>[...]

Airborne-NextGen 09.09.25: Textron Nixes ePlane, Joby L/D Flt, Swift Approval

Also: Space Command Moves, Alpine Eagle, Duffy Names Amit Kshatriya, Sikorsky-CAL FIRE Collab Textron eAviation is putting the development of its Nexus electric vertical takeoff an>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC