Eclipse Eyes Double Eagle II Manufacturing Site | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Wed, Apr 06, 2005

Eclipse Eyes Double Eagle II Manufacturing Site

Promises To File Development Plan This Month

If Eclipse has its way, the Double Eagle II Airport near Albuquerque will soon be a very busy place. Already, that strip has been designated as the new home for Utilicraft Aerospace's manufacturing operation. Now, Eclipse has filed paperwork to build its VLJs at the same airport.

"They are going to be applying for approval of a site development plan on or before April 7, and there will be a hearing on it on April 19," says Russell Brito, a senior planner with the Environmental Planning Commission. He was quoted by the New Mexico Business Weekly.

The Eclipse application says its manufacturing operation at Double Eagle II should be under construction by 2010. Company officials say they'll eventually employ 1,500 people at the airport, turning out 1,500 planes a year.

"We are doing some preliminary master planning. It is very preliminary. We don't have any architectural work done," said Eclipse's facilities director, Larry Jones.

If everyone signs off on the construction project, the new Eclipse factory will sit on 150 acres of airport land.

That would make for a much bigger facility than the one Eclipse now operates at the Albuquerque International Sunport. Right now, the company occupies a 90,000 square foot renovated hangar.

Eclipse had originally planned to build a $75 million facility at Double Eagle II back in 2003. But developmental delays in the Eclipse 500 forced a two-year delay in those plans.

As ANN reported in February, Utilicraft Aerospace had apparently overcome financing concerns among both New Mexico state officials and leaders of the Navajo Nation, promising to go ahead with construction of its manufacturing plant at Double Eagle II.

FMI: www.eclipseaviation.com

Advertisement

More News

NTSB Prelim: Piper PA-23

Pilot Also Reported That Due To A Fuel Leak, The Auxiliary Fuel Tanks Were Not Used On June 4, 2025, at 13:41 eastern daylight time, a Piper PA-23, N2109P, was substantially damage>[...]

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

Classic Aero-TV: One Man’s Vietnam

From 2023 (YouTube Edition): Reflections on War’s Collective Lessons and Cyclical Nature The exigencies of war ought be colorblind. Inane social-constructs the likes of racis>[...]

ANN's Daily Aero-Linx (07.03.25)

Aero Linx: Colorado Pilots Association (CPA) Colorado Pilots Association was incorporated as a Colorado Nonprofit Corporation in 1972. It is a statewide organization with over 700 >[...]

ANN's Daily Aero-Term (07.03.25): High Speed Taxiway

High Speed Taxiway A long radius taxiway designed and provided with lighting or marking to define the path of aircraft, traveling at high speed (up to 60 knots), from the runway ce>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC