NASA's LCROSS Satellite Heads To Florida For Launch | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Thu, Feb 19, 2009

NASA's LCROSS Satellite Heads To Florida For Launch

Mission Wil Seek Water Ice on Moon

NASA's Lunar Crater Observation and Sensing Satellite, known as LCROSS, is enroute from Northrop Grumman's facility in Redondo Beach, Calif., to NASA's Kennedy Space Center in Florida in preparation for a spring launch.

The satellite's primary mission is to search for water ice on the moon in a permanently shadowed crater near one of the lunar poles. LCROSS is a low-cost, accelerated-development, companion mission to NASA's Lunar Reconnaissance Orbiter, or LRO. At Kennedy, the two spacecraft will be integrated with an Atlas V launch vehicle and tested for final flight worthiness. LCROSS and LRO are the first missions in NASA's plan to return humans to the moon and begin establishing a lunar outpost by 2020.

After launch, the LCROSS spacecraft and the Atlas V's Centaur upper stage rocket will fly by the moon and enter into an elongated orbit to position the satellite for impact. On final approach, the spacecraft and Centaur will separate. The Centaur will strike the chosen lunar crater, creating a debris plume that will rise above the surface. Four minutes later, LCROSS will fly through the debris plume, collecting and relaying data back to Earth before striking the moon's surface and creating a second debris plume. Scientists will use data from the debris clouds to determine the presence or absence of water ice.

"The LCROSS project has had to work within very challenging cost-cap and schedule-cap constraints," said Dan Andrews, LCROSS project manager at NASA's Ames Research Center in Moffett Field, CA. "The shipping of our spacecraft is a testament to our balanced approach and the great people working on this project."

To remain within budget and a short schedule of 26 months, the LCROSS project team developed a simple yet innovative spacecraft that uses existing NASA systems, commercial-off-the-shelf components modified to survive the harsh conditions of space, and the spacecraft design and development expertise of integration partner Northrop Grumman Space Technologies.

"LCROSS delivers a high science value per dollar," said Steve Hixson, vice-president for advanced concepts at Northrop Grumman Aerospace Systems in Redondo Beach. "With its versatile, fast and cost efficient architecture, the LCROSS spacecraft serves as a pathfinder for future low-cost Earth and space science missions."

LCROSS is scheduled for launch April 24... though, as ANN reported earlier this week, that launch could be delayed if the shuttle Discovery doesn't lift off before the end of this month.

FMI: www.nasa.gov/lcross, www.nasa.gov/lro

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC