NTSB Continues Investigation Of Dreamliner Engine Failure In SC | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.19.25

Airborne-NextGen-05.20.25

AirborneUnlimited-05.21.25

Airborne-AffordableFlyers-05.22.25

AirborneUnlimited-05.23.25

Fri, Sep 28, 2012

NTSB Continues Investigation Of Dreamliner Engine Failure In SC

Reports That A Second Cracked Fan Midshaft Was Discovered In A GEnx-1B Engine On A 787 Which Had Not Yet Flown

The NTSB is continuing its investigation of an incident which occurred on July 28, 2012 involving a Boeing 787-8 airplane that experienced a loss of thrust in the right engine—a General Electric (GE) GEnx-1B turbofan – during a pre-first flight, low-speed taxi test at Charleston International Airport in Charleston, South Carolina. As reported in an earlier update, the investigation found that the forward end of the fan midshaft (FMS) fractured and separated. Examination of other pre-delivery engines revealed a second GEnx-1B engine with a cracked FMS that was installed on a 787-8 airplane that had not yet flown.

The investigation is ongoing, and an initial inspection of all in-service GEnx engines has been completed. Most recently, on September 11, 2012, a Boeing 747-8F with GE GEnx-2B turbofan engines experienced a loss of power in the No. 1 engine during the takeoff roll at Shanghai Pudong International Airport, Shanghai, China. The Civil Aviation Administration of China (CAAC) is investigating this incident, and the NTSB is participating as the state of design and manufacture of the engine and aircraft. Any investigative updates regarding this incident will be provided by the CAAC.

As part the CAAC’s investigation and in relation to the NTSB’s ongoing investigation of the July 28th engine failure, preliminary findings from the examination of the Shanghai incident engine revealed that the FMS was intact and showed no indications of cracking. The examination and teardown of that engine is continuing under the direction of the CAAC.

FMI: www.ntsb.gov

 


Advertisement

More News

ANN's Daily Aero-Term (05.29.25): Terminal Radar Service Area

Terminal Radar Service Area Airspace surrounding designated airports wherein ATC provides radar vectoring, sequencing, and separation on a full-time basis for all IFR and participa>[...]

ANN's Daily Aero-Term (05.30.25): Very High Frequency (VHF)

Very High Frequency (VHF) The frequency band between 30 and 300 MHz. Portions of this band, 108 to 118 MHz, are used for certain NAVAIDs; 118 to 136 MHz are used for civil air/grou>[...]

Aero-News: Quote of the Day (05.30.25)

“From approximately November 2021 through January 2022, Britton-Harr, acting on behalf of AeroVanti, entered into lease-purchase agreements for five Piaggio-manufactured airc>[...]

Airborne 05.23.25: Global 8000, Qatar B747 Accepted, Aviation Merit Badge

Also: Virtual FLRAA Prototype, IFR-Capable Autonomous A/C, NS-32 Crew, Golden Dome Missile Defense Bombardier announced that the first production Global 8000 successfully completed>[...]

ANN's Daily Aero-Linx (05.30.25)

Aero Linx: The 1-26 Association (Schweizer) The Association’s goal is to foster the helpfulness, the camaraderie, and the opportunity for head-to-head competition that is fou>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC