Discovery Launch Delayed Until At Least Thursday | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.24.25

AirborneNextGen-
11.18.25

Airborne-Unlimited-11.19.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Wed, Nov 03, 2010

Discovery Launch Delayed Until At Least Thursday

Electrical Problem Is The Culprit

The Space Shuttle Program Mission Management Team decided to delay the final launch of Discovery by at least one day. The shuttle is scheduled for an 11-day mission to the International Space Station.

The Prelaunch Mission Management Team wants to give engineers more time to look deeply into two electrical issues from a main engine computer controller that cropped up Tuesday morning. Mike Moses, chair of the MMT, said the problems are believed to be tied to a circuit breaker in the shuttle's cockpit.

Rather than rush the shuttle launch team through an analysis and launch cycle quickly, Moses said he opted to let the engineers work throughout the night on the issue without having to worry about an early morning tanking and Wednesday afternoon launch. The MMT will meet again Wednesday at 1400 EDT and then decide whether to try to launch Thursday. A liftoff Thursday would be at 1529.

FMI: www.nasa.gov

Advertisement

More News

NTSB Prelim: Funk B85C

According To The Witness, Once The Airplane Landed, It Continued To Roll In A Relatively Straight Line Until It Impacted A Tree In His Front Yard On November 4, 2025, about 12:45 e>[...]

Aero-News: Quote of the Day (11.21.25)

"In the frame-by-frame photos from the surveillance video, the left engine can be seen rotating upward from the wing, and as it detaches from the wing, a fire ignites that engulfs >[...]

ANN's Daily Aero-Term (11.21.25): Radar Required

Radar Required A term displayed on charts and approach plates and included in FDC NOTAMs to alert pilots that segments of either an instrument approach procedure or a route are not>[...]

Classic Aero-TV: ScaleBirds Seeks P-36 Replica Beta Builders

From 2023 (YouTube Edition): It’s a Small World After All… Founded in 2011 by pilot, aircraft designer and builder, and U.S. Air Force veteran Sam Watrous, Uncasville,>[...]

Airborne 11.21.25: NTSB on UPS Accident, Shutdown Protections, Enstrom Update

Also: UFC Buys Tecnams, Emirates B777-9 Buy, Allegiant Pickets, F-22 And MQ-20 The NTSB's preliminary report on the UPS Flight 2976 crash has focused on the left engine pylon's sep>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC