Boeing Breaks Ground In St. Louis For New Composites Center | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.20.24

Airborne-Unlimited-05.28.24

Airborne-FlightTraining-05.29.24 Airborne-Unlimited-05.30.24

Airborne-Unlimited-05.24.24

Thu, Dec 18, 2014

Boeing Breaks Ground In St. Louis For New Composites Center

Facility To Support 777X Work And Future Opportunities

Construction is underway in St. Louis for a new 367,000-square-foot facility in which Boeing will build parts for the newest member of its 777 commercial airplanes family, the 777X.

About 700 new jobs will be created for the 777X work. Construction should be complete in 2016, with work on 777X wing and empennage parts starting in 2017. The facility is an expansion of Boeing’s current tooling center at the site and will contain six autoclaves.

“As we move forward with construction of our new center, we will significantly enhance our aerospace composite capability in St. Louis, positioning us for today’s opportunities, and tomorrow’s,” said Bob Ciesla, vice president, Boeing Military Aircraft Cross-Enterprise Design/Build. “This is a tremendous opportunity for Boeing St. Louis and the entire region, which enables us to bridge to the future as a site with both commercial and defense capabilities.”

Boeing’s St. Louis site, which marked its 75th anniversary this year, is renowned for military aircraft production. More than 12,000 fighter jets have been built there and the site is headquarters for the Boeing Defense, Space & Security business unit. As of Dec.1, the company had about 15,000 employees in Missouri.

Earlier this year, Boeing selected its Everett, Wash. site as the location for a new composite wing center for the 777X program. In this wing center, Boeing will perform fabrication and assembly of the 777X’s composite wing. Additionally, Boeing will perform final assembly of the 777X in Everett.

There will be two 777X models – the 777-8X, with approximately 350 seats and a range capability of more than 9,300 nautical miles; and the 777-9X, with approximately 400 seats and a range of more than 8,200 nautical miles. The 777X has 300 orders and commitments from six customers worldwide. First delivery is targeted for 2020.

(Image from file)

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Linx (05.29.24)

Aero Linx: International Association of Professional Gyroplane Training (IAPGT) We are an Association of people who fly, build or regulate Gyroplanes, who have a dream of a single >[...]

ANN's Daily Aero-Term (05.29.24): NORDO (No Radio)

NORDO (No Radio) Aircraft that cannot or do not communicate by radio when radio communication is required are referred to as “NORDO.”>[...]

ANN's Daily Aero-Term (05.30.24): Beyond Visual Line Of Sight (BVLOS)

Beyond Visual Line Of Sight (BVLOS) The operation of a UAS beyond the visual capability of the flight crew members (i.e., remote pilot in command [RPIC], the person manipulating th>[...]

ANN's Daily Aero-Linx (05.30.24)

Aero Linx: Malibu M-Class Owners and Pilots Association (MMOPA) The Piper M-Class Owners & Pilots Association (PMOPA) is a not-for-profit organization dedicated to the interest>[...]

Aero-News: Quote of the Day (05.30.24)

“After eight months of negotiating, and a failed TA, unfortunately management has not recognized the pilots’ needs. We have expressed to management that we are willing >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC