EXTRAORDINARY! Astronauts Complete Fifth/Final Hubble Repair Spacewalk | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.19.25

Airborne-NextGen-05.20.25

AirborneUnlimited-05.21.25

Airborne-AffordableFlyers-05.22.25

AirborneUnlimited-05.23.25

Tue, May 19, 2009

EXTRAORDINARY! Astronauts Complete Fifth/Final Hubble Repair Spacewalk

Truly Amazing Effort Ends With Triumph

NASA is rebuilding its can-do image this week with the apparently successful completion of the extremely aggressive Hubble repair mission.

STS-125 mission specialists John Grunsfeld and Drew Feustel completed the fifth and final spacewalk on the Hubble Space Telescope Monday at 3:22 p.m. EDT. Outside the airlock hatch, Grunsfeld said, "This is a really tremendous adventure that we’ve been on, a very challenging mission. Hubble isn’t just a satellite- it’s about humanity’s quest for knowledge."

He also thanked several people who contributed to Hubble and the servicing mission, then went on to say,

"A tour de force of tools and human ingenuity. On this mission in particular, the only way of finding the limits of the possible is by going beyond them into the impossible. On this mission, we tried some things that some people said were impossible….We’ve achieved that, and we wish Hubble the very best. It’s really a sign of the great country that we live in that we’re able to do things like this on a marvelous spaceship, like space shuttle Atlantis. I’m convinced that if we can solve problems, like repairing Hubble, getting into space, doing the servicing we do, travelling 17,500 mph around the Earth, we can achieve other great things, like solving the energy problems and climate problems- all of the things that are in the middle of NASA’s prime and core values. As Drew and I go into the airlock, I want to wish Hubble its own set of adventures and with the new instruments that we’ve installed that it may unlock further mysteries of the universe."

Grunsfeld and Feustel finished the mission’s battery replacement work. They worked in the telescope’s Bay 3 to replace the second of two battery modules. Each module weighs 460 pounds and contains three batteries, providing electrical power to support Hubble operations during the night portion of its orbit. The first battery module was installed during the second spacewalk.

They also replaced one of the telescope’s fine guidance sensors. The sensors are used to provide pointing information and also serve as a scientific instrument for determining relative position and motion of stars.

After those two tasks were accomplished, Feustel and Grunsfeld turned their attention to the New Outer Blanket Layer (NOBL) on the outside of the telescope’s Bay 5, Bay 8 and Bay 7, which normally face in the direction of Hubble’s orbital travel. These blankets were expected to deteriorate more in the space environment. The NOBL on Bay 8 was to be installed during the fourth spacewalk, but the crew was unable to accomplish it due to work on a stripped bolt.

Monday’s spacewalk lasted 7 hours and 2 minutes.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (05.29.25): Terminal Radar Service Area

Terminal Radar Service Area Airspace surrounding designated airports wherein ATC provides radar vectoring, sequencing, and separation on a full-time basis for all IFR and participa>[...]

ANN's Daily Aero-Term (05.30.25): Very High Frequency (VHF)

Very High Frequency (VHF) The frequency band between 30 and 300 MHz. Portions of this band, 108 to 118 MHz, are used for certain NAVAIDs; 118 to 136 MHz are used for civil air/grou>[...]

Aero-News: Quote of the Day (05.30.25)

“From approximately November 2021 through January 2022, Britton-Harr, acting on behalf of AeroVanti, entered into lease-purchase agreements for five Piaggio-manufactured airc>[...]

Airborne 05.23.25: Global 8000, Qatar B747 Accepted, Aviation Merit Badge

Also: Virtual FLRAA Prototype, IFR-Capable Autonomous A/C, NS-32 Crew, Golden Dome Missile Defense Bombardier announced that the first production Global 8000 successfully completed>[...]

ANN's Daily Aero-Linx (05.30.25)

Aero Linx: The 1-26 Association (Schweizer) The Association’s goal is to foster the helpfulness, the camaraderie, and the opportunity for head-to-head competition that is fou>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC