Boeing: 'Getting Closer' to Assembling First 787 Dreamliner | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-FlightTraining-07.10.25

AirborneUnlimited-07.11.25

Sat, Jan 13, 2007

Boeing: 'Getting Closer' to Assembling First 787 Dreamliner

Boeing tells ANN that it is showing steady progress toward building the first 787 Dreamliner with the rollout of its second specially-modified freighter and a successful first pickup of 787 parts from Japan.

The load consists of section 43, a forward fuselage section made by Kawasaki Heavy Industries, and section 11/45, the center wheel well and center wing tank, made by KHI and Fuji Heavy Industries and joined at FHI. These were loaded onto the 747-400 Large Cargo Freighter -- now known as the Dreamlifter -- earlier today at Centrair Airport in Nagoya. The large composite parts are destined for Charleston, S.C.

"Today is an exciting day for Boeing and our Japanese partners," said Scott Strode, 787 vice president of Airplane Development and Production. "Transporting these parts from FHI and KHI is the first step in assembling the first 787. We're very pleased with how it went and with the quality of the parts received."

In another sign of production readiness, the second Dreamlifter rolled out of the hangar Jan. 7 in Taipei, Taiwan, sporting its distinctive new white and blue livery. The airplane will take its first flight in the next several weeks.

Three Dreamlifters are being modified by Evergreen Aviation Technologies Corporation at its facility at Taiwan Taoyuan International Airport.

FMI: www.boeing.com

Advertisement

More News

Aero-News: Quote of the Day (07.11.25)

“Honored to accept this mission. Time to take over space. Let’s launch.” Source: SecTrans Sean Duffy commenting after President Donald Trump appointed U.S. Secret>[...]

ANN's Daily Aero-Term (07.11.25): Permanent Echo

Permanent Echo Radar signals reflected from fixed objects on the earth's surface; e.g., buildings, towers, terrain. Permanent echoes are distinguished from “ground clutter&rd>[...]

ANN's Daily Aero-Linx (07.11.25)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

NTSB Final Report: Schweizer SGS 2-33A

Glider Encountered A Loss Of Lift And There Was Not Sufficient Altitude To Reach The Airport Analysis: The flight instructor reported that while turning final, the glider encounter>[...]

NTSB Prelim: Aeronca 7AC

Airplane Climbed To 100 Ft Above Ground Level, At Which Time The Airplane Experienced A Total Loss Of Engine Power On May 24, 2025, at 1300 eastern daylight time, an Aeronca 7AC, N>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC