Boeing: 'Getting Closer' to Assembling First 787 Dreamliner | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.06.25

AirborneNextGen-
10.07.25

Airborne-Unlimited-10.08.25

Airborne-FlightTraining-10.09.25

AirborneUnlimited-10.10.25

Sat, Jan 13, 2007

Boeing: 'Getting Closer' to Assembling First 787 Dreamliner

Boeing tells ANN that it is showing steady progress toward building the first 787 Dreamliner with the rollout of its second specially-modified freighter and a successful first pickup of 787 parts from Japan.

The load consists of section 43, a forward fuselage section made by Kawasaki Heavy Industries, and section 11/45, the center wheel well and center wing tank, made by KHI and Fuji Heavy Industries and joined at FHI. These were loaded onto the 747-400 Large Cargo Freighter -- now known as the Dreamlifter -- earlier today at Centrair Airport in Nagoya. The large composite parts are destined for Charleston, S.C.

"Today is an exciting day for Boeing and our Japanese partners," said Scott Strode, 787 vice president of Airplane Development and Production. "Transporting these parts from FHI and KHI is the first step in assembling the first 787. We're very pleased with how it went and with the quality of the parts received."

In another sign of production readiness, the second Dreamlifter rolled out of the hangar Jan. 7 in Taipei, Taiwan, sporting its distinctive new white and blue livery. The airplane will take its first flight in the next several weeks.

Three Dreamlifters are being modified by Evergreen Aviation Technologies Corporation at its facility at Taiwan Taoyuan International Airport.

FMI: www.boeing.com

Advertisement

More News

Airborne 10.06.25: FAA Furloughs, Airshows Hit By Shutdown, Livestream Accident

Also: Pilot Age Cap, Skylar AI Flight Assistant, NS-36 Mission, ALPA v Shutdown The federal government has officially gone into lockdown mode. The FAA will be laying off around a f>[...]

ANN's Daily Aero-Term (10.10.25): Performance-Based Navigation (PBN) [ICAO]

Performance-Based Navigation (PBN) [ICAO] Area navigation based on performance requirements for aircraft operating along an ATS route, on an instrument approach procedure or in a d>[...]

ANN's Daily Aero-Linx (10.10.25)

Aero Linx: The Society of United States Air Force Flight Surgeons (SoUSAFFS) Thank you for visiting the Society of United States Air Force Flight Surgeons (SoUSAFFS) web page. We a>[...]

NTSB Final Report: Costruzioni Aeronautiche Tecnam P2006T

Postaccident Examination Of The Airplane Revealed That The Carburetor Heat Levers Remained In The OFF Position Analysis: The flight instructor and commercial pilot receiving multi->[...]

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC