Orion’s First Launch Attempt Beset By Multiple, Annoying Issues | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.19.25

Airborne-NextGen-05.20.25

AirborneUnlimited-05.21.25

Airborne-AffordableFlyers-05.22.25

AirborneUnlimited-05.23.25

Fri, Dec 05, 2014

Orion’s First Launch Attempt Beset By Multiple, Annoying Issues

Trespassing Boats, Gusty Winds and Recalcitrant Valves… Oh My!

BY ANN Space Correspondent, Wes Oleszewski -- From The Cape

With crowds resembling those that gathered at the Kennedy Space Center for high-profile Shuttle Launches lining the roads and shoreline, the first Orion EFT launch attempt was scrubbed – but not without a lot of drama.

The first delay in the count came when a boat strayed into range safety’s restricted area.

Once the count resumed, the next hold was triggered by a gust of wind at the pad.

Reportedly, a mission rule that was programmed into the countdown computer was set to detect wind, blown from a given direction at a given velocity. Such wind is a hazard due to the wide cross-section of the launch vehicle. Once the countdown was recycled and started again, a second wind violation took place.

The process was repeated and restarted a third time when another wind violation took place. Upon that the launch directors elected to mask the wind limitation in the computer and make a manual judgment on the wind.
While the final wind decision was being made an issue was discovered with the Liquid Hydrogen (LH2) valve in the center CBC. As that valve was being exercised, and trouble shooting was taking place, a similar issue was detected in the port side CBC. These valves control the in-flow of the LH2 and once closed, are left in that position for the flight. Additionally, they can be used as a drain for the LH2. Each is a ball-valve that is more than 10 inches in diameter and located at the base of each CBC.

The count was recycled but the launch team decided to scrub the launch for the day as the launch window was about to close and no positive fix was found.

As of this writing a second attempt at launching the EFT-1 will take place Friday morning at 7:05 a.m. Eastern time. If, however, a 48 hour delay is required a Saturday Lunch will be attempted also at 7:05 a.m.

FMI: www.nasa.gov

 


Advertisement

More News

Oshkosh Memories: An Aero-News Stringer Perspective

From 2021: The Inside Skinny On What Being An ANN Oshkosh Stringer Is All About By ANN Senior Stringer Extraordinare, Gene Yarbrough The annual gathering at Oshkosh is a right of p>[...]

NTSB Prelim: Piper PA32RT

Video Showed That During The Takeoff, The Nose Baggage Door Was Open On May 10, 2025, about 0935 eastern daylight time, a Piper PA-32RT-300, N30689, was destroyed when it was invol>[...]

ANN FAQ: Follow Us On Instagram!

Get The Latest in Aviation News NOW on Instagram Are you on Instagram yet? It's been around for a few years, quietly picking up traction mostly thanks to everybody's new obsession >[...]

Aero-News: Quote of the Day (05.28.25)

"I think what is key, we have offered a bonus to air traffic controllers who are eligible to retire. We are going to pay them a 20% bonus on their salary to stay longer. Don't reti>[...]

ANN's Daily Aero-Term (05.28.25): Pilot Briefing

Aero Linx: Pilot Briefing The gathering, translation, interpretation, and summarization of weather and aeronautical information into a form usable by the pilot or flight supervisor>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC