Boeing Completes 1st Flight Of GE-Powered 787 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.19.25

Airborne-NextGen-05.20.25

AirborneUnlimited-05.21.25

Airborne-AffordableFlyers-05.22.25

AirborneUnlimited-05.23.25

Fri, Jun 18, 2010

Boeing Completes 1st Flight Of GE-Powered 787

Fifth Dreamliner In The Test Fleet Is The First With GE Engines

The first Boeing 787 Dreamliner with General Electric (GE) engines, an airplane referred to as ZA005, completed its first flight at 1829 PDT Wednesday, following a 3-hour-and-48-minute flight over the state of Washington.

GE executives and Boeing employees were on hand to welcome Captains Mike Bryan and Mike Carriker to Boeing Field in Seattle following completion of the flight.

"The airplane handled just like I expected," said Bryan, who captained the flight. "It was just like every other 787 flight that I've flown in the last several months - smooth, per plan and excellent."

"We're pleased to introduce the fifth Dreamliner to the flight-test fleet and to start flight testing with GE engines," said Scott Fancher, vice president and general manager of the 787 program for Boeing Commercial Airplanes. "It's taken the collective resources and dedication of our teams to get to this day. There's just nothing like a first flight to validate that it has been worth the sacrifices we have all seen our teams make in the past several years."

ZA005 will be used to test the General Electric engine package and demonstrate that the changes made with the new engine do not change the airplane's handling characteristics.

The sixth, and final, 787 to join the flight test program is expected to fly before the end of July.

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (05.29.25): Terminal Radar Service Area

Terminal Radar Service Area Airspace surrounding designated airports wherein ATC provides radar vectoring, sequencing, and separation on a full-time basis for all IFR and participa>[...]

ANN's Daily Aero-Term (05.30.25): Very High Frequency (VHF)

Very High Frequency (VHF) The frequency band between 30 and 300 MHz. Portions of this band, 108 to 118 MHz, are used for certain NAVAIDs; 118 to 136 MHz are used for civil air/grou>[...]

Aero-News: Quote of the Day (05.30.25)

“From approximately November 2021 through January 2022, Britton-Harr, acting on behalf of AeroVanti, entered into lease-purchase agreements for five Piaggio-manufactured airc>[...]

Airborne 05.23.25: Global 8000, Qatar B747 Accepted, Aviation Merit Badge

Also: Virtual FLRAA Prototype, IFR-Capable Autonomous A/C, NS-32 Crew, Golden Dome Missile Defense Bombardier announced that the first production Global 8000 successfully completed>[...]

ANN's Daily Aero-Linx (05.30.25)

Aero Linx: The 1-26 Association (Schweizer) The Association’s goal is to foster the helpfulness, the camaraderie, and the opportunity for head-to-head competition that is fou>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC