Vega To Fly ESA Experimental Reentry Vehicle | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-08.25.25

Airborne-NextGen-08.26.25

AirborneUnlimited-08.27.25

Airborne-AffordableFlyers-08.28.25

AirborneUnlimited-08.22.25

Tue, Dec 20, 2011

Vega To Fly ESA Experimental Reentry Vehicle

Launch Of IXV Planned In 2014 From French Guiana

The launch of ESA's IXV Intermediate eXperimental Vehicle on Europe's new Vega rocket is now in detailed planning, a major step towards the craft's flight in 2014. After launch into a suborbital trajectory from Europe's Spaceport in French Guiana, IXV will return to Earth as if from a low-orbit mission, to test and qualify new critical technologies for future reentry vehicles.

ESA IXV Artist's Rendering

The flight profile calls for the IXV to attain an altitude of around 279 miles, allowing it to reach a velocity of 4.6 miles/second on entering the atmosphere. It will collect a large amount of data during its hypersonic and supersonic flight, while it is being controlled by thrusters and aerodynamic flaps. IXV will then descend by parachute and land in the Pacific Ocean to await recovery and analysis.

ESA and the Arianespace launch provider signed a contract on 14 December to study the launch on Vega, as part of the VERTA - Vega Research and Technology Accompaniment - program.

The rocket's qualification flight planned for liftoff at the end of January will pave the way for the next five VERTA missions that will demonstrate the system's flexibility. At a planned rate of two launches per year, the program will allow the smooth introduction of Vega for commercial exploitation. Following development of critical technologies and completion of the design, the vehicle's manufacturing, assembly, integration and qualification is now under way for a flight window between January and September 2014.

Procurement of the ground network has begun, including the mission control center, ground station telemetry kits, transportable antennas and communication network.

FMI: www.esa.int

Advertisement

More News

Aero-News: Quote of the Day (08.28.25)

“We have seen astounding demand for the G800, and the entire Gulfstream team is excited to begin making deliveries to our customers. The G800 is entering service with extraor>[...]

ANN's Daily Aero-Linx (08.28.25)

Aero Linx: Recreational Aviation Australia (RAAus) Recreational Aviation Australia is progressively working towards improving safety outcomes through a holistic approach to safety >[...]

Classic Klyde Morris (08.25.25)

Classic Klyde Morris From 11.07.16 (and Remembering Bob...) FMI: www.klydemorris.com>[...]

Airborne 08.25.25: Zenith Homecoming, VP Racing, Affordable Flying Expo 2025

Also: GADFLY AI-Driven Engine Analysis, Knockoff Iranian Drones, Russian Surveillance, 40 NASA Missions Chopped This year’s Zenith Homecoming event will soon be taking off at>[...]

Airborne 08.22.25: ARC Spinoff, Nat'l Championship Air Races, Hawkins Accident

Also: H55 Completes American Tour, Robinson Trade-Ins, Retired AV-8B Harrier, NS-35 Mission Organizers of the iconic annual Air Race Classic will soon be opening registration for t>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC