AD: Sabreliner | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.21.25

Airborne-Unlimited-07.22.25

AirborneUnlimited-07.23.25

Airborne-Unlimited-07.24.25

AirborneUnlimited-07.25.25

Thu, Dec 15, 2005

AD: Sabreliner

AD NUMBER: 2005-25-18
MANUFACTURER: Sabreliner
SUBJECT: Airworthiness Directive 2005-25-18
SUMMARY:
The FAA is superseding an existing airworthiness directive (AD), which applies to certain Sabreliner Model NA-265-40, NA-265-50, NA-265-60, NA-265-70, and NA-265-80 series airplanes. That AD currently requires repetitive inspections for discrepancies in the front and rearspars of the wing in the area of the wing center section, and in the lugs on the rear spar and wing trailing edge panel rib, and corrective actions if necessary.

This new AD expands the applicability of the existing AD and requires new repetitive inspections for fuel leaks of the front and rear spars of the wing, and for discrepancies in the front and rear spars of the wing in the area of the wing center section, and in the lugs on the rear spar and wing trailing edge panel rib. This AD also requires related investigative and corrective actions, if necessary.

This AD results from reports of cracking in the upper and lower flanges of the front and rear spars of the wing near the wing center section, and in the lugs on the rear spar. We are issuing this AD to detect and correct cracking or other discrepancies in these areas, which could result in structural failure of the wing.

FMI: www.faa.gov/regulations_policies/airworthiness_directives/

Advertisement

More News

Airborne 07.21.25: Nighthawk!, Hartzell Expands, Deltahawk 350HP!

Also: New Lakeland Fly-in!, Gleim's DPE, MOSAIC! Nearly three-quarters of a century in the making, EAA is excited about the future… especially with the potential of a MOSAIC>[...]

ANN's Daily Aero-Term (07.27.25): Estimated (EST)

Estimated (EST) -When used in NOTAMs “EST” is a contraction that is used by the issuing authority only when the condition is expected to return to service prior to the >[...]

ANN's Daily Aero-Linx (07.27.25)

Aero Linx: Regional Airline Association (RAA) Regional airlines provide critical links connecting communities throughout North America to the national and international air transpo>[...]

NTSB Final Report: Luce Buttercup

The Airplane Broke Up In Flight And Descended To The Ground. The Debris Path Extended For About 1,435 Ft. Analysis: The pilot, who was the owner and builder of the experimental, am>[...]

Classic Aero-TV: 'That's All Brother'-Restoring a True Piece of Military History

From 2015 (YouTube version): History Comes Alive Thanks to A Magnificent CAF Effort The story of the Douglas C-47 named, “That’s all Brother,” is fascinating from>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC