GE Rolls-Royce Fighter Engine Team to Test Fifth Engine This Year | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.10.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-Unlimited-11.06.25

AirborneUnlimited-11.07.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Wed, Sep 15, 2010

GE Rolls-Royce Fighter Engine Team to Test Fifth Engine This Year

New Engine Testing Key to F-35 Flight Testing

The GE Rolls-Royce Fighter Engine Team will begin testing its fifth development engine in 2010 with a test schedule that positions the F136 program for flight testing next year in the F-35 Lightning II Joint Strike Fighter.

The new test engine (Engine 008) is installed at GE’s test facility in Evendale, Ohio, working final checkout before initiating tests later in the month. The engine will undergo Conventional Take Off and Landing (CTOL) flight clearance endurance testing and advance the F136 program toward Initial Flight Release next year.

Another new test engine (Engine 007) began testing at GE’s test facility in July, and is undergoing performance operability qualification tests, including additional controls, augmentor and fan testing.

The Fighter Engine Team plans to reach 1,000 hours of testing in 2010, and says the engine has demonstrated consistent success and performance, including a number of important achievements:

  • Cleared fan aeromechanics through a wide operating range, in support of current testing at both Evendale and the USAF Arnold Engineering Development Center (AEDC) in Tennessee.
  • Reaching maximum augmented thrust and demonstrating consistent, successful light-offs and operability of the augmentor.
  • Accelerated Mission Testing initiated with efforts on Engine 006, with more set to begin in upcoming weeks.
  • Altitude testing progresses throughout the operating envelope.
  • Successful completion of CTOL Common Exhaust System clearance testing, allowing the afterburner to be tested around the full operating envelope, to full maximum A/B conditions.
  • Demonstrated significant thrust margins at sea-level test conditions.

“The F136 engine has reached many major milestones already, proving the capability not only of the design but the entire GE Rolls-Royce Fighter Engine Team. We are all energized and eager to compete in the Joint Strike Fighter program,” said Al DiLibero, President of the GE Rolls-Royce Fighter Engine Team in a press release issed on Monday.


GE F136 Engine Test/FILE PHOTO

“We are checking off a new test point or milestone virtually every day, as we move toward flight test. This is an exciting time for the F136 team and these major successes motivate the team to keep reaching for the next accomplishment,” said Mark Rhodes, Senior Vice President of the GE Rolls-Royce Fighter Engine Team.

In addition to Engines 007 and 008, Engine 004 recently concluded testing at GE, while Engine 005 tests are under way at AEDC. Engine 005 is the first development F136 engine to test at AEDC. Engine 006 also tested earlier this year and will resume testing in a few months, in Short Take Off/Vertical Landing (STOVL) configuration.

Engine 009 is in assembly and will begin testing within a few months. That will make a total of six F136 engines in test in 2010.

Production has already begun on Flight Test Engine 041, the first F136 to fly in the F-35 Lightning II aircraft. Final assembly will take place in early 2011, followed by the beginning of acceptance testing by mid-year. Flight Test Engine 041 is scheduled to take to the skies in the AF-1 test aircraft.

FMI: www.FighterEngineTeam.com

 


Advertisement

More News

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

Classic Aero-TV: Bob Hoover At Airventure -- Flight Test and Military Service

From 2011 (YouTube Edition): Aviation's Greatest Living Legend Talks About His Life In Aviation (Part 5, Final) ANN is pleased to offer you yet another snippet from the public conv>[...]

Aero-News: Quote of the Day (11.12.25)

“All Air Traffic Controllers must get back to work, NOW!!! Anyone who doesn’t will be substantially ‘docked. For those Air Traffic Controllers who were GREAT PATR>[...]

ANN's Daily Aero-Linx (11.12.25)

Aero Linx: American Navion Society Welcome to the American Navion Society. Your society is here to support the Navion community. We are your source of technical and operating infor>[...]

ANN's Daily Aero-Term (11.12.25): Glideslope Intercept Altitude

Glideslope Intercept Altitude The published minimum altitude to intercept the glideslope in the intermediate segment of an instrument approach. Government charts use the lightning >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC