Robots Rule Tuesday Onboard International Space Station | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Wed, Mar 19, 2008

Robots Rule Tuesday Onboard International Space Station

Crew Readies Dextre For Action; NASA May Extend Endeavour's Stay

Robots ruled Tuesday for the STS-123 and Expedition 16 crews, as crewmembers spent some time indoors following two successful spacewalks three days.

Canadarm 2, the International Space Station’s robot arm, grabbed the pallet that secured Dextre during its journey to the orbital outpost, and return the pallet to space shuttle Endeavour’s payload bay for return to Earth, according to NASA.

The Canadian-built Dextre is the final element of the station’s Mobile Servicing System. Mission Specialists Rick Linnehan (shown above) and Mike Foreman finished assembling Dextre Sunday during the second spacewalk of STS-123.

As ANN reported, Linnehan and Robert L. Behnken installed the orbiting, all-purpose repair-bot's "eyes" (a pair of waist-mounted cameras) and "hands" (a number of tools) during a spacewalk late Monday evening.

The station and shuttle crews also will prepare hardware to be used in a shuttle tile repair test on the next spacewalk, and they will get some much needed off duty time.

Foreman and Behnken are slated to begin the mission’s fourth spacewalk at 1828 EDT Thursday. The two will perform tasks that include the shuttle tile repair test and change out of a circuit breaker on the station.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (11.16.25): NonApproach Control Tower

NonApproach Control Tower Authorizes aircraft to land or takeoff at the airport controlled by the tower or to transit the Class D airspace. The primary function of a nonapproach co>[...]

Aero-News: Quote of the Day (11.16.25)

“This shutdown inflicted real damage. Beyond disrupting operations and adding risk into the aviation system… it hindered essential career growth opportunities and stal>[...]

ANN's Daily Aero-Linx (11.16.25)

Aero Linx: The Mooney Mite Site Dedicated to the Mooney M-18 Mite, "The Most Personal Airplane," and to supporting Mite owners everywhere. The Mooney M-18 Mite is a single-place, l>[...]

NTSB Final Report: Vans Aircraft Inc RV-12

Pilot’s Improper Installation Of The Control Stick Pushrod Assemblies, Which Resulted In Separation Of The Left Pushrod And A Total Loss Of Roll Control Analysis: While retur>[...]

ANN FAQ: How Do I Become A News Spy?

We're Everywhere... Thanks To You! Even with the vast resources and incredibly far-reaching scope of the Aero-News Network, every now and then a story that should be reported on sl>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC