Everett Sets Sights On New Boeing Products | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.19.25

Airborne-NextGen-05.20.25

AirborneUnlimited-05.21.25

Airborne-AffordableFlyers-05.22.25

AirborneUnlimited-05.23.25

Wed, Mar 28, 2012

Everett Sets Sights On New Boeing Products

Hope To Land Assembly Of 777X, 787-10 Airplanes

After a deal was struck that will have the Boeing 737 MAX built in Everett, WA, state and union leaders have set their sights on keeping assembly work on other new Boeing products in the Pacific Northwest. But it has not been determined where the planemaker will put together its planned 777X or 787-10 airplanes, let alone where it might build any clean-sheet design it introduces in the future.

Washington Governor Chris Gregoire has said often and publicly that her administration will work to keep any new Boeing assembly work in the Puget Sound region.

The Everett, WA, Herald newspaper reports that Snohomish County COO John Monroe says that there is no guarantee that Boeing will build the planned 777X there. Boeing has hinted that the follow-on 777 will have composite wings and new engines. Commercial Airplane president Jim Albaugh has said that it could be "significantly more efficient" than existing models.

Monroe said that there are a number of concerns he has about the new airplane, including a properly skilled workforce to build the large composite structures, and factory space in Everett. As Boeing ramps up production of the current 777 models, it utilizes a growing amount of the available space.

But State Commerce Department director Rogers Weed told the paper that the recent agreement between Boeing and the Machinists Union will make a strong case for building the 777X in Washington State. The 787-10 could go elsewhere, he said, based on the second production line Boeing opened in South Carolina and a plant that is doing finishing work on the Dreamliner in San Antonio, TX.

FMI: www.boeing.com, www.governor.wa.gov

Advertisement

More News

ANN's Daily Aero-Term (05.29.25): Terminal Radar Service Area

Terminal Radar Service Area Airspace surrounding designated airports wherein ATC provides radar vectoring, sequencing, and separation on a full-time basis for all IFR and participa>[...]

ANN's Daily Aero-Term (05.30.25): Very High Frequency (VHF)

Very High Frequency (VHF) The frequency band between 30 and 300 MHz. Portions of this band, 108 to 118 MHz, are used for certain NAVAIDs; 118 to 136 MHz are used for civil air/grou>[...]

Aero-News: Quote of the Day (05.30.25)

“From approximately November 2021 through January 2022, Britton-Harr, acting on behalf of AeroVanti, entered into lease-purchase agreements for five Piaggio-manufactured airc>[...]

Airborne 05.23.25: Global 8000, Qatar B747 Accepted, Aviation Merit Badge

Also: Virtual FLRAA Prototype, IFR-Capable Autonomous A/C, NS-32 Crew, Golden Dome Missile Defense Bombardier announced that the first production Global 8000 successfully completed>[...]

ANN's Daily Aero-Linx (05.30.25)

Aero Linx: The 1-26 Association (Schweizer) The Association’s goal is to foster the helpfulness, the camaraderie, and the opportunity for head-to-head competition that is fou>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC