MQ-8C Fire Scout Completes Operational Assessment | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.15.25

AirborneNextGen-
09.09.25

Airborne-Unlimited-09.10.25

Airborne-AffordableFlyers-09.11.25

AirborneUnlimited-09.12.25

Sat, Dec 05, 2015

MQ-8C Fire Scout Completes Operational Assessment

Completed Assessment Period Last Month At Point Magu Naval Base

The MQ-8C Fire Scout completed a three week operational assessment period Nov. 20 at Naval Base Ventura County at Point Mugu, California.

The OA included 11 flights totaling 83.4 flight hours where Fire Scout was tested against maritime and surveyed land targets to assess system performance, endurance and reliability of the unmanned helicopter.

“MQ-8C is meeting or exceeding its performance objectives and will deliver greater warfighting capabilities to the fleet in the future,” said Capt Jeff Dodge , Fire Scout’s program manager for Multi-Mission Tactical Unmanned Aerial Systems.

The MQ-8C will provide twice the endurance and three times the payload as the existing MQ-8B.  It has a range of 150 nautical miles and a payload capacity of more than 700 pounds which provides unique situational awareness and precision target support for the Navy on land and at-sea with its multiple intelligence, surveillance and reconnaissance (ISR) capabilities.

The smaller MQ-8B, currently deployed on the USS Fort Worth (LCS-3), has flown more than 16,000 hours and demonstrated the ability to operate alongside the MH-60 manned helicopter during ship-based operations.

“The C model will greatly impact how we monitor, understand and control the sea and air space around small surface combatants,” Dodge said.

The MQ-8C has logged 427 flights and more than 730 flight hours to date.  Initial ship-based testing is scheduled to begin in fiscal year 2017.

(Image provided with NAVAIR news release)

FMI: www.navair.navy.mil

Advertisement

More News

NTSB Final Report: Evektor-Aerotechnik A S Harmony LSA

Improper Installation Of The Fuel Line That Connected The Fuel Pump To The Four-Way Distributor Analysis: The airplane was on the final leg of a flight to reposition it to its home>[...]

ANN's Daily Aero-Term (09.15.25): Decision Altitude (DA)

Decision Altitude (DA) A specified altitude (mean sea level (MSL)) on an instrument approach procedure (ILS, GLS, vertically guided RNAV) at which the pilot must decide whether to >[...]

Aero-News: Quote of the Day (09.15.25)

“With the arrival of the second B-21 Raider, our flight test campaign gains substantial momentum. We can now expedite critical evaluations of mission systems and weapons capa>[...]

Airborne 09.12.25: Bristell Cert, Jetson ONE Delivery, GAMA Sales Report

Also: Potential Mars Biosignature, Boeing August Deliveries, JetBlue Retires Final E190, Av Safety Awareness Czech plane maker Bristell was awarded its first FAA Type Certification>[...]

Airborne 09.10.25: 1000 Hr B29 Pilot, Airplane Pile-Up, Haitian Restrictions

Also: Commercial A/C Certification, GMR Adds More Bell 429s, Helo Denial, John “Lucky” Luckadoo Flies West CAF’s Col. Mark Novak has accumulated more than 1,000 f>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC