General Atomics Awarded Initial EMALS Contract | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Mon, Aug 18, 2014

General Atomics Awarded Initial EMALS Contract

System Will Be Installed On Future Aircraft Carrier John F. Kennedy

U.S. Naval Air Systems Command (NAVAIR) awarded General Atomics (GA) an initial sole-source contract for Electromagnetic Aircraft Launch System (EMALS) and Advanced Arresting Gear (AAG) for the CVN 79 aircraft carrier to be named John F. Kennedy.

This contract is for the initial procurement of the long-lead-time materials in support of a full production contract for installation of EMALS and AAG into CVN 79, the second of the Gerald R. Ford-class aircraft carriers. CVN 79 is scheduled to be delivered to the U.S. Navy in 2023.

GA Electromagnetic Systems Group will manufacture EMALS and AAG components at its state-of-the-art 367,000 square foot manufacturing facility in Tupelo, Miss.

“These are exciting times. We are beginning EMALS and AAG production for the second ship in the class, CVN 79, as these systems are being integrated into the Gerald R. Ford (CVN 78). We are proud to be part of the team that is putting cutting-edge technology into the world’s premier aircraft carriers and into the hands of Naval forces,” says Dean Key, Director of Launch and Recovery Production Programs, General Atomics.

GA was awarded the prime contract to provide EMALS and AAG systems for CVN 78 in June 2009 and is manufacturing the CVN 78 hardware concurrently with the System Design and Demonstration (SDD) programs. Hardware delivery to CVN 78 is scheduled to be completed in 2014.

(Image provided by General Atomics)

FMI: www.navy.mil, www.ga.com

 


Advertisement

More News

Classic Aero-TV: Extra Aircraft Announces the Extra 330SX

From 2023 (YouTube Edition): An Even Faster Rolling Extra! Jim Campbell joined General Manager of Extra Aircraft Duncan Koerbel at AirVenture 2023 to talk about what’s up and>[...]

Aero-News: Quote of the Day (11.15.25)

“Receiving our Permit to Fly and starting Phase 4 marks a defining moment for Vertical Aerospace. Our team has spent months verifying every core system under close regulatory>[...]

ANN's Daily Aero-Term (11.15.25): Middle Marker

Middle Marker A marker beacon that defines a point along the glideslope of an ILS normally located at or near the point of decision height (ILS Category I). It is keyed to transmit>[...]

NTSB Final Report: Lancair 320

The Experienced Pilot Chose To Operate In Instrument Meteorological Conditions Without An Instrument Flight Rules Clearance Analysis: The airplane was operated on a personal cross->[...]

Airborne 11.14.25: Last DC-8 Retires, Boeing Recovery, Teeny Trig TXP

Also: ATI Strike Prep, Spirit Still Troubled, New CubCrafters Dealership, A-29 Super Tucano Samaritan’s Purse is officially moving its historic Douglas DC-8 cargo jet into re>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC